Choose what this site may use

This site uses strictly necessary cookies to work and to remember your privacy choices. With your permission it would also load content hosted by other services, such as videos, maps and fonts, which then receive your network address and device data. We do not sell or share your personal information and we run no advertising. Choose Accept all, Reject all or Customise. You can change your mind at any time through Privacy choices at the foot of every page.

  • Always on

    Needed for the site to work and to remember your privacy choices. Always on.

  • Remembers settings you choose, such as the light or dark display, in your browser.

  • Loads videos, maps and other content hosted by other services. Those services receive your address and device data.

Menu Close
In this section: Learn
Start
Guides
Domain packs
Participants
Security and privacy
Pilot kits
Operations
Ecosystem

P2 report: Earth-observation product lineage

Source docs/pilots/p2-eo-product-lineage/REPORT_TEMPLATE.md

On this page
  1. 1. Summary
  2. 2. Success criteria
  3. 3. Runs
  4. 4. Findings
  5. 5. Gaps and questions for the editors
  6. 6. Privacy and legal
  7. 7. Claims check
  8. 8. Effort and cost
  9. 9. Sign-off

Fill this at the end of the pilot. Facts only. A result is about the documents and runs listed; it is not a conformance claim and is never described as one. Where the pilot used a draft proposal, the report says so.

1. Summary

Field Entry
Pilot, period, lead role
Goal (copy from the README)
Protocol tree (commit) and draft copies used (OIP numbers)
One-paragraph outcome, in plain words

2. Success criteria

Id Criterion Measured value Met, partly, not met Evidence file
E1 A product manifest states processing level, extent, acquisition interval and lineage
E2 Lineage is acyclic and each input present in the set matches its digest
E3 An analysis-ready-data claim names the specification, its version and an assessment, and never uses a certification word
E4 An EO calibration record states gain, offset with unit and uncertainty
E5 A consumer can find the product by catalogue item and read its chain
E6 A correction to an input marks the dependent product as needing recomputation

3. Runs

Step Command (or description) Date Result as seen Matches the README? Log file

4. Findings

# Where What happened Class (defect in the draft, gap in the protocol, tooling, our own error, external) Proposed follow-up

5. Gaps and questions for the editors

List every point where the draft text or the tooling did not let you do what the goal needs, in the same form as the open questions of an OIP. Mark an external edition you did not check as not checked.

Item Entry
Does the pilot touch personal data?
Privacy assessment completed and attached
Questions put to counsel, and answers received (quote, do not interpret)

7. Claims check

Statement Allowed?
“The pilot ran the open suite on its evidence and the report is attached” yes, with digests
Any statement that a party is certified, compliant, secure or verified never
Any statement that a draft requirement was met only as “the draft’s case passed on this evidence”
Any level above SELF_TESTED never

8. Effort and cost

Role Hours Notes

9. Sign-off

Role Date Statement that the report is a fair record
Pilot lead
Reviewer (not the lead)