In this section: Learn
Guides
- Guide: choosing and implementing a binding
- Guide: OBSP-COMMUNITY (COMMUNITY)
- Conformance guide
- Guide: OBSP-CONSTELLATION (CONSTELLATION)
- Guide: OBSP-CONSUMER
- Guide: the exchange plane (reference implementation)
- Guide: OBSP-GRID
- Implementers guide
- Guide: OBSP-MOBILE (MOBILE)
- Guide: OBSP-MODEL-OBSERVER (MODEL-OBSERVER)
- Guide: OBSP-NETWORK-SENSING (NETWORK-SENSING, provisional)
- Guide: OBSP-NODE
- Guide: operating the reference stack
- Operators guide
- Guide: OBSP-PROVIDER
- Python SDK: the 0.2 candidate mode (DRAFT)
- Release guide
- Guide: OBSP-SITE
- Guide: OBSP-SOV (operator sovereignty overlay)
- Start here: from a clone to a checked evidence set in 30 minutes
- Guide: the web front ends
Domain packs
- All domain packs
- Agriculture: fields, crops, livestock and stored grain
- Air quality: reference monitors and sensor networks
- Cryosphere: snow, glaciers, permafrost, sea and lake ice
- Greenhouse gases and methane: in-situ, flux and remote sensing
- Health (One Health): environment, animals and people
- Hydrology: river, lake, groundwater and water-quality stations
- Infrastructure: structural health of bridges, dams, tunnels and buildings
- Meteorology: surface synoptic and climate stations (GBON-oriented)
- Ocean: moorings, buoys, profiling floats and coastal stations
- Seismology and geodesy: seismometers, strong motion, GNSS and InSAR
- Space weather: geomagnetism, ionosphere and the solar wind
Participants
- Non-profits, humanitarian organisations, communities and citizen networks
- Device makers
- Enterprises and infrastructure owners
- Governments, agencies and utilities
- Individual experts, developers and students
- United Nations agencies and intergovernmental organisations
- National consortiums, national standards councils and national hosts
- Universities, observatories and research networks
- Managed-service and technology providers
Security and privacy
- Threat note: obsp-mcp (reference Model Context Protocol server)
- Threat note: credential status publisher (reference service)
- Threat note: discovery (reference service)
- Threat note: production public services
- Threat note: implementations and conformance registry (reference service)
- Threat note: transparency log (reference service)
- Supply chain: controls and current status
- Threat model of the Observatory Protocol (version 2)
- Privacy assessments
- Draft privacy impact assessment: COMMUNITY profile (OIP-0017)
- Draft privacy impact assessment: MOBILE profile, person-carried case (OIP-0013)
- Draft privacy impact assessment: NETWORK-SENSING profile (OIP-0011)
- Privacy impact assessment template
Pilot kits
Operations
- Operations
- Capacity scaling
- Capacity plan
- Chaos and resilience experiments
- Data plane
- Deploy
- Error-budget policy
- Game days
- Game day: clock skew
- Game day: disk full
- Game day: federation partition and rejoin
- Game day: replica loss
- Game day: slow or unreachable database
- Incident response
- Key rotation and compromise recovery
- Load and soak testing
- Observability conventions
- Offline site operation
- What the owner must decide
- Restore
- Rollback
- Service-level objectives
- Static web sites
- Supply chain and release hardening: the checks
- Variables
Error-budget policy
What an operator of an Observatory Protocol deployment does as the error budget of an objective is spent. The
objectives are in slos.yaml and explained in slo.md; this
policy is a proposal for the owner to confirm together with them (OD-08). It applies to an operator’s deployment,
not to the protocol, and the reference programs of this repository make no promise against it.
Budget
Each objective has a target over a rolling 30-day window; the budget is 1 - target of the window’s events (for
availability and freshness, of the window’s minutes):
| Objective | Target | Budget in 30 days |
|---|---|---|
| SLO-AVAIL | 99.5% of probes succeed | 0.5% of probes, about 3.6 hours of failed probing |
| SLO-INGEST | 99% of replay batches within 0.5 s | 1% of batches slower than 0.5 s |
| SLO-CORRECTION | 99% of corrections visible everywhere within 60 s | 1% of corrections slower than 60 s or lost |
| SLO-VERIFY | 99.9% of intake and verification requests without a 5xx | 0.1% of those requests |
| SLO-LOG-FRESH | 99.9% of minutes with a signed tree head under 300 s old | about 43 minutes |
The remaining budget is the recording rule obsp:slo_error_budget_remaining:ratio{slo} (1 is untouched, 0 is spent,
negative is overspent), shown on the SLO dashboard.
Alerts and who acts
Multi-window, multi-burn-rate alerts (generated into
slo.rules.yml): an alert fires only when the error ratio exceeds
the burn threshold over a long and a short window at once, so it fires fast for a sharp burn and clears soon after
the burn stops.
| Burn rate | Long / short window | Budget spent at that rate | Severity | Response |
|---|---|---|---|---|
| 14.4x | 1 h / 5 min | 2% in one hour | page | the on-call operator acknowledges within 15 minutes and follows the runbook |
| 6x | 6 h / 30 min | 5% in six hours | page | the same |
| 3x | 1 d / 2 h | 10% in one day | ticket | handled within the next working day |
| 1x | 3 d / 6 h | 10% in three days | ticket | reviewed at the weekly operations review |
A page silences the ticket alerts of the same objective (alert manager inhibition). The reference stack’s alert manager has no receivers that leave the host; an operator wires pages and tickets to their own tools.
Budget states and what changes
| Remaining budget (30 days) | State | Changes |
|---|---|---|
| more than 50% | healthy | releases and experiments proceed normally; game days may run in production-like environments |
| 50% to 25% | caution | every release names its rollback (rollback.md); chaos experiments run against staging only |
| 25% to 0% | at risk | releases limited to fixes for the objective at risk and security fixes; capacity changes reviewed (capacity-scaling.md); the owner of the objective reports daily |
| spent (0% or below) | frozen | no release except one that restores the objective or fixes a security issue, until the budget is positive again over the last 7 days; a post-incident review within five working days (incident-response.md) |
Security fixes are never held back by a budget. A freeze is lifted by the deployment’s owner, who records why.
Exclusions
Not counted against a budget: announced maintenance windows (the prober’s targets are marked down for the window and the time is removed from the window’s events), failures caused by a client sending invalid requests (they are 4xx and outside SLO-VERIFY by definition), and a dependency outside the operator’s control when the operator’s runbook says so in advance. Every exclusion is recorded with its reason in the post-incident review.
Review
The objectives, thresholds and this policy are reviewed every quarter, and after every freeze, against the measured
indicators: an objective never at risk may be tightened; one frozen twice in a quarter is either resourced or
loosened by a reviewed change to slos.yaml (which regenerates the alerts and dashboards).