Skip to content
Skip to contentNexus Observatory

Systems integration: equipment from many makers assembled and tested as one system. The loop, step by step: 1. Parts from many vendors on one bench. 2. The chain from source to console stands ready. 3. The integration rack powers up each part. 4. Each reading is stamped with time and place. 5. Interfaces are connected one at a time. 6. Relays carry the packets without reading them. 7. Signatures are checked before any model runs. 8. Each interface is tested against the design. 9. The edge releases confirmed results only. 10. One interface fails its timing test. 11. The fault is traced and the setting fixed. 12. Sensors check that the response worked. 13. The system passes its end-to-end test. 14. The console shows the evidence with the alert. 15. Record, proof and action are archived together. 16. Everything settles back to idle.

01 / 16

Parts from many vendors on one bench

Nexus Observatory

/

Design and integration
One accountable integrator, site to grid.

System design against the reference architecture, engineering packs a contractor can build from, multi-vendor integration on typed interfaces, and programme delivery across many sites with one plan, one schedule and one evidence record.

Plan with usReference architectureThe open protocol

At a glance

One accountable integrator, site to grid

Design and integration delivers system design against the reference architecture, engineering packs a contractor can build from, multi-vendor integration on typed interfaces and programme delivery with one plan, one schedule and one evidence record. Every site of a type is built the same way, by whichever contractor builds it.

সমস্যা

Many suppliers, nobody accountable

Large observing programmes buy from many suppliers. Without one design and one interface contract, every boundary becomes a dispute and every site a one-off. Programmes slip at the interfaces, not in the components, and nobody can say where the delay comes from.

Key facts

Interfaces
OPC UA · IEC 61850 · DNP3 · MQTT · OGC SensorThings

Components

  • Pole-mounted edge gateway node
  • Overhead line sensor on a distribution span
  • Automatic weather station (AWS) to WMO siting practice
  • Distribution pole transformer and meter cabinet
  • Private LTE mast on a solar skid
  • “AI tower in a box”
  • Data hall row pair with cold-aisle containment
  • Operations console with a video wall

Interfaces

উপকরণসমূহ
SDI-12 · RS-485 / Modbus RTU · 4–20 mA
Radio
Ethernet · LTE-M / NB-IoT · LoRaWAN
Time and position
GNSS 1PPS
Security
TPM 2.0
Publishing
MQTT

Where it works

  • Many suppliers, one interface contract

In the story below

  1. The system, part by part
  2. Assembly
  3. Installation
  4. Deployment
  5. Connections
  6. Operation
  7. Failure and recovery
  8. Scale and federation
  9. What you get

Scenes · 17

Next steps

Plan a deploymentRead the specificationTalk to salesSee Programme delivery
  1. সমস্যা

    Many suppliers, nobody accountable

    Large observing programmes buy from many suppliers. Without one design and one interface contract, every boundary becomes a dispute and every site a one-off. Programmes slip at the interfaces, not in the components, and nobody can say where the delay comes from.

  2. What it does

    One accountable integrator, site to grid

    Design and integration delivers system design against the reference architecture, engineering packs a contractor can build from, multi-vendor integration on typed interfaces and programme delivery with one plan, one schedule and one evidence record. Every site of a type is built the same way, by whichever contractor builds it.

  3. প্রকৌশল

    Design packs a contractor can build from

    Drawings, bills of materials, cable schedules and configuration are delivered as one pack per site type, so the hundredth site is built like the first. Each pack is versioned, so a change is made once, reviewed once and applied to every site of that type.

    See Engineering
  4. The system

    One station, part by part

    Before anything is installed, the station is laid out as its parts: instrument, logger and edge compute, secure element, GNSS timing, radio, power, enclosure, wiring, earthing, mast and foundation.

  5. Assembly

    Built and tested before it ships

    Each part is fitted to the pole and the enclosure, wired through surge protection to one earth, powered and bench-tested until it signs its first reading.

  6. Deployment

    Site after site, one design

    The same station goes in at every site on the plan, each commissioned against the same checklist, until the field is covered.

  7. Wiring

    Signal, power and time, wired

    Inside one site the instrument’s signal pair runs to the logger, solar charges the battery that feeds the load, GNSS time reaches the clock and the logger hands its records to the radio.

  8. Multi-vendor integration

    Many suppliers, one interface contract

    Each interface is written as a typed contract: OPC UA or IEC 61850 into control systems, MQTT and SensorThings into the observing network. Suppliers are tested against the contract, not against each other. A supplier change is a test run against the contract, not a redesign.

    Interfaces
    OPC UA · IEC 61850 · DNP3 · MQTT · OGC SensorThings
    See Multi-vendor integration
  9. Connections

    Backhaul, time and power

    The relay carries every site to the edge over a point-to-point link, the grandmaster’s time reaches every clock, and each site keeps its power through the night.

  10. Time and records

    One clock, one record across suppliers

    Every supplier’s equipment is timed from the same traceable source and writes into the same record, so faults that cross a boundary can be followed from end to end. Interface tests check timing as well as content, because a correct value at the wrong time is still a failure.

  11. System design

    Requirements to architecture

    Requirements are traced to an architecture drawn against the standards, so every component has a reason, an interface and a test. Each decision is recorded with its reason, so a change later in the programme starts from the original intent.

    See System design
  12. সীমারেখা

    Safe connection to operational systems

    Where observation meets control, the boundary is designed first: zones, conduits, read-only defaults and a firewall whose rules are part of the design pack. No plant system takes commands from the observing network unless the design explicitly allows it and the owner signs that off.

  13. Acceptance

    Tested against the plan, signed off on evidence

    Each site is accepted against written criteria with measured results; the programme is accepted when every site’s evidence is complete. Failures found at acceptance are fixed and retested, and the evidence of both is kept with the site record. Nothing is accepted without evidence.

    See Acceptance
  14. Installation

    Built and wired to the pack

    Crews build each site to its pack, with deviations recorded and approved, so the as-built record matches what is in the ground. Crews photograph and test as they go, so the record is built during installation, not reconstructed afterwards. Every deviation is approved and kept.

  15. Programme delivery

    Many sites, one plan and one schedule

    Site types are repeated across the programme; crews, supply and acceptance are scheduled together, and progress is reported from the evidence record. Risks and dependencies are tracked across the programme, and every site’s status comes from its own evidence. Progress is never reported from opinion.

    See Programme delivery
  16. What you get

    Programmes, integration and management

    The reference architecture and interface contracts are open. National observing network programmes, systems integration and programme management are contracted. Pricing follows the programme’s scale and phases, with one point of accountability from design to acceptance; the documentation, models and records stay yours at the end.

    Talk to sales
  17. Next step

    Share your requirements

    Send us the programme’s requirements and constraints, and the sites you have in mind. We return an architecture, a site typology, the interface contracts and a delivery plan with its milestones. The plan scales from a pilot site to a national programme.

    Plan a deploymentRead the specification

More presentations

See it from every side.

Each opens as a full-screen presentation: deeper pages on the same subject, explainers, stories, guided tours of the places, network scenes and the observatories that came before.

All presentations

In depth

Use case Utility grid-edge private LTE and wildfire weatherUse case Street flood observatoryISIC section · ISIC O Public administration and defence; compulsory social securityUse case GBON gap-filler station

Explainers

Explainer · Government and public safety Government and public safetyWildfire cameras on real terrain, GBON station density, street-flood alert thresholds, CAP alerting with the authority in the loop and the radio horizon of a deployable cell.Explainer · Scientific Scientific, explained

Stories

Story · Federation across agencies Many agencies, one pictureNo single agency observes everything it needs. Federation lets each keep its own systems and still share: common interfaces, common catalogues and common…Story · Resilient operations When the links failObserving systems matter most on the days infrastructure fails. Designing for that day means local autonomy, stored power, store-and-forward delivery and…Story · End to end An observation grid, end to endAn observation is not a reading. It is a reading with a place, a time, a calibration and a path that anyone can follow back. An observing grid is the…

Places and networks

Guided tour · Guided 3D tour Mountain valley siteA private 5G tower, an automatic weather station, a compact radar and a seismic vault on real alpine terrain, joined to an edge data centre that admits, times and publishes every…Guided tour · Guided 3D tour River basinWater-level gauges along a river valley floor, a weather station and an edge node: the red isoline is the ground that lies within a few metres of the lowest point of the reach.Guided tour · Guided 3D tour Wildfire forestCamera masts on the ridges, a weather station in the stand and a private cell: the red ground is what the ridge camera can see.Network scene · NTN · Satellite Satellite direct to device in a mountain valleyWhere the valley cell cannot reach, phones on the pass road connect straight to a low-orbit satellite, which relays through its feeder link to a gateway.Network scene · Backhaul · Fresnel zone Microwave backhaul across a river valleyAn 18 GHz hop from the church tower to a mast on the far side of the flood plain: its first Fresnel zone, clearance over the town and trees, and what a new building in the path…

Heritage observatories

Heritage observatory · China · 132 Zhang Heng’s seismoscopeIn 132 CE a court astronomer presented a bronze urn that, it was recorded, told the capital of an earthquake no one in Luoyang had felt. No original survives.Heritage observatory · United States · 1921 Caltech Seismological LaboratoryA laboratory in Pasadena that gave earthquakes a number. The Richter magnitude scale of 1935 depended on one instrument type in many places, a lesson as relevant to networks today…

Interactive tools

Interactive tool · Configure a station Station BuilderConfigure a station part by part in 3D, check the rules as you go and request a quote for the assembly.

01 · What this platform covers

Design and integration, area by area.

Choose an area for its systems, standards, the industries it serves and how we deliver it.

01

System design

Requirements to architecture, drawn against the standards.
02

প্রকৌশল

Design packs, bills of materials and drawings.
03

Multi-vendor integration

Many suppliers, one interface contract.
04

Programme delivery

Many sites, one plan and one schedule.
05

Acceptance

Tested against the plan, signed off on evidence.

02 · Built on the open protocol

One protocol under every platform.

Marked: the functions this platform leans on hardest. The protocol itself is open, so what you build here runs anywhere the protocol runs.

01 JOIN

02 ADMIT

03 DESCRIBE

04 TIME

05 OBSERVE

06 QUALIFY

07 FEDERATE

08 ORCHESTRATE

03 · Open and enterprise

Open by default. Enterprise by contract.

The open layer lives on the main site, free to use and build on. Enterprise services are delivered under contract by Nexus Observatory Inc.

Open, on the main site

  • Reference architecture
  • Interface contracts

Enterprise, on this site

  • National observing network programmes
  • Systems integration
  • Programme management

04 · Industries served

The industries that build on design and integration.

Each industry has its own site: its use cases, its community and the enterprise path, with this platform among the systems behind it.

শিল্প Public safetyWarning time, gained at the sensor.শিল্প GovernmentNational observing infrastructure, delivered as one programme.শিল্প মানবিকObservation where the need is greatest and the grid is thinnest.শিল্প অবকাঠামোAssets that report their own condition.

05 · Every platform

Every platform, one architecture.

One platform for each technical area of our work, on the same protocol, the same data and the same design.

Protocol & GridSoftwareHardware & powerSensors & instrumentsConnectivityEdge compute & AIEarth observation & GeoAIField servicesData & licensingSpace and satellite systemsPositioning, navigation and timingSecurity and trustDigital twins and simulationDesign and integrationTest and qualificationOperations centreTraining and enablementFrontier labs

Bring us the site.

We bring the survey, the design and the crew. Nexus Observatory Inc. The form names who receives your details.

Talk to usCreate account
Nexus Observatory/

One accountable integrator, site to grid.

System design against the reference architecture, engineering packs a contractor can build from, multi-vendor integration on typed interfaces, and programme delivery across many sites with one plan, one schedule and one evidence record.

01 · What this platform covers

Choose an area for its systems, standards, the industries it serves and how we deliver it.

02 · Built on the open protocol

One protocol under every platform.

Marked: the functions this platform leans on hardest. The protocol itself is open, so what you build here runs anywhere the protocol runs.

03 · Open and enterprise

Open by default. Enterprise by contract.

The open layer lives on the main site, free to use and build on. Enterprise services are delivered under contract by Nexus Observatory Inc.

Open, on the main site
    Enterprise, on this site
      04 · Industries served

      Each industry has its own site: its use cases, its community and the enterprise path, with this platform among the systems behind it.

      05 · Every platform

      One platform for each technical area of our work, on the same protocol, the same data and the same design.

      Bring us the site.

      We bring the survey, the design and the crew. Nexus Observatory Inc. The form names who receives your details.