Distribution feeders now carry power both ways, from rooftops, batteries and chargers as well as from substations. Operators need to see voltage, load and faults along feeders they once ran blind, and to manage distributed resources safely. Feeder sensors, transformer monitors and meters on a utility private network give the control room that view, with evidence for every outage.

Plan a deploymentHow it worksStation Builder
Industry
Energy
Measurements
5
Sources cited
7
  1. Energy · Distribution networks and the grid edge

    Feeders that flow both ways

    Distribution feeders were built to carry power one way and run largely unseen between substation and customer. Rooftop solar, batteries, chargers and heat pumps have changed that. Utilities now need to see voltage, load, resources and faults along every feeder, and a network that reaches every pole.

  2. What is measured

    Along the feeder

    Feeder sensors and reclosers record current, voltage and fault events; transformer monitors record load and temperature; meters at points of interconnection record distributed resource output; weather stations on poles watch high-risk areas. The private network reports the health of every device it carries.

    Instruments
    Feeder sensors · Reclosers · Transformer monitors · DER meters · Pole weather
  3. The base node

    A gateway on the pole

    Each pole station’s industrial gateway reads field devices over utility protocols, signs every value with its identity and time and sends it through a modem on the private network. It keeps events locally through any outage, because outages are when the evidence matters.

  4. Radio and links

    A private network to every pole

    A utility private LTE network reaches poles and substations on spectrum the utility controls. Fibre joins substations and depots to the core, battery indicators report over LoRaWAN, and public cellular can carry non-critical data while the private network grows. Each choice follows the survey.

    Links
    Private LTE · Fibre · LoRaWAN · Public cellular
  5. How it works

    From a fault to a restored feeder

    A fault current is captured by a feeder device, read by the pole gateway, signed and sent over private LTE through the core and the security gateway to the substation edge. Fault location runs there, and the control room receives the likely section with its evidence for switching.

  6. From order to operation · Order

    Scope feeders and goals

    The scope reads the utility’s reliability goals, distributed resource growth, wildfire risk areas and existing automation. Nexus Observatory Inc. returns a device plan per feeder class, the private network design, the integration with operations and a price per feeder and per substation.

    Plan a deployment
  7. From order to operation · Survey

    Survey feeders and radio sites

    Crews survey representative feeders, poles, transformers and substations with distribution and telecom engineers. They measure radio coverage, choose radio sites, check pole loading and power, and record each device position against the utility’s asset records. Feeders are chosen to represent the network’s classes, so the design repeats.

  8. From order to operation · Permits

    Spectrum, poles and security

    The private network uses spectrum the utility holds or leases; pole attachments follow the utility’s standards; every field device joins only through the utility’s security programme. Changes to protection follow the utility’s procedures. Every device is registered in the asset records before it joins.

  9. From order to operation · Build

    Build devices by class

    Pole stations, gateways, modems, transformer monitors and radio sites are built and tested by class, enrolled with their identities and labelled with asset numbers, so each device appears in the right place in the utility’s records from the first reading.

    Open the Station Builder
  10. From order to operation · Install

    Install feeder by feeder

    Radio sites go in first, then pole stations, sensors and transformer monitors along each feeder under live-line or planned-outage procedures. Each installation is checked against the asset record and photographed. Crews follow the utility’s own work methods, and customers on affected feeders are told about planned outages in advance.

  11. From order to operation · Commission

    Commission devices and fault logic

    Each device proves its identity and is checked against the substation’s measurements; fault location is tested against known events or tests; voltage logic runs in observation before it acts. Coverage and latency are measured and recorded per device. Results are signed into each device’s record.

  12. From order to operation · Operate

    See the feeder, restore faster

    Operators see voltage, load and resources along each feeder, located faults with their evidence and device health across the network. Restoration and voltage actions are logged, and outage records support reliability reporting. Field crews see the same located fault on their devices, so they drive to the right section first.

  13. From order to operation · Maintain

    Grow with the grid edge

    Devices are added as feeders grow and resources connect, software and security updates move in rings, and radio sites are added where coverage is needed. Every change updates the asset and network records. Devices that fall silent are visible at once, and their last readings stay in the record.

    Book field services
  14. Data products

    For operators, crews and regulators

    Operators and planners see feeders with their voltage, load and resources; crews receive located faults; asset managers see transformer health; reliability teams receive outage records; telecom teams see network performance. All come from the same signed, time-stamped device data. Each carries the identity of the device that produced it.

    See the data products
  15. Evidence

    Evidence for every outage

    Every device’s identity and attestation, every event, every switching action and every change are signed and kept. Device data follows utility automation protocols, distributed resources follow the interconnection standard, and security follows the industrial security series, so regulators and auditors can follow any outage end to end.

    Drawn against
    IEC 61850 · IEEE 1815 · IEEE 1547 · ISA/IEC 62443
  16. What you get

    Power-grid edge and right-of-way monitoring

    Line temperature and sag, vegetation encroachment from EO and LiDAR, substation sensors and fire-weather at the right-of-way. Delivered as managed service and data licence, for electric utilities and transmission operators. Scale: Utility service territories. Service levels are written as numbers you can measure on your own dashboard.

    Talk to sales
  17. Next step

    Plan distribution networks and the grid edge with us

    Tell us the site, the measurements and the rules it answers to. We reply with a survey proposal, a design and a scope for distribution networks and the grid edge. An engineer replies with a survey proposal and a scope, and the plan grows from one site to the network you need, at your pace.

    Plan a deploymentOpen the Station BuilderOpen the Studio

01The place and its hazards

Where it runs, and what can go wrong.

Operating contextDistribution networks take power from substations to homes and businesses over feeders, transformers and switches. Rooftop solar, batteries, heat pumps and electric vehicle chargers have changed flows and voltages, and interconnection rules set how distributed resources must behave. Utilities automate switching, locate faults and restore supply faster, and must report reliability to regulators.

Hazards

  • Voltage outside limits as distributed generation and new loads grow
  • Transformer overload and failure
  • Faults that take long to locate
  • Wildfire ignition from equipment in high-risk areas
  • Cyber intrusion through field devices

02What must be measured

What, where, how often, and under which rules.

Each measurement names where it is taken, how often, and the public standard or regulation behind it. Numbers in the sources column open the cited source below.

MeasurementWhereCadenceSources
Feeder current, voltage and fault eventsFeeder sensors and reclosers along the lineContinuous, with event capture12
Transformer load and temperatureDistribution transformersContinuous3
Distributed resource output and behaviourAt the point of interconnectionContinuous4
Weather in high-risk areasStations on poles in wildfire and storm risk areasContinuous5
Network coverage and device healthEvery field device on the private networkContinuous67

03The observation stack

From one base unit to a network.

The same blocks at every scale: instruments and a base node, a site with its radio, a fleet run as one, and a network federated on the open protocol.

  1. 01

    Base unit

    A pole station: an industrial gateway reading feeder devices and meters, a modem on the utility network and weather sensors where risk calls for them.

    Build a station →
  2. 02

    Site

    A feeder: sensors, reclosers, transformer monitors and weather stations on poles, served by the private network’s radio sites.

    Plan a site →
  3. 03

    Fleet

    Every feeder of a utility run as one fleet, with one device inventory, one update ring and one evidence trail.

    Managed offers →
  4. 04

    Network

    Distribution operators, transmission operators and aggregators exchange data through federated records, each with the access the rules give them.

    The open protocol →
  • 01Energy and power-quality meter
  • 02Compact weather station
  • 03OT gateway (OPC UA, Modbus)
  • 04Small cell (4G/5G)
  • 055G core appliance (UPF/core)
  • 06Zero-trust gateway
  • 07Fibre terminal
  • 08Battery case
  • 09Pole

Radio and links

Private LTE

A utility private network reaches every pole and substation on spectrum the utility controls, with the priority grid devices need.

Radio and links

Fibre

Substations and depots join the core over fibre.

Radio and links

LoRaWAN

Low-cost transformer and fault indicators report small readings on batteries.

Radio and links

Public cellular

Where the private network is still being built, public cellular can carry non-critical data.

Edge computeSubstation edge nodes locate faults from feeder events, check voltage along each feeder and act within the limits operations sets, so restoration and voltage management do not wait for the central system.

PowerPole stations take power from the low-voltage supply with battery backup, so they report through the outages they are meant to locate.

04How it works

From the instrument to the product.

One observation’s path, tier by tier, with the interface on every link and a bill of materials below; then how the one node grows to a site, a fleet and federated networks.

Distribution networks and the grid edge: data path

– of 10

01 Instruments Measurement with sensor identity andcalibration 02 Node – Wrap in an observation envelope with timequality– Measure quality and uncertainty, attachquality flags– Buffer locally (store-and-forward when thelink drops) 03 Field radio 04 Radio access 05 Core network 06 Local network 07 Backhaul Commit with transactional outbox andpublish, delivered at least once 08 Site Consumer inbox deduplicates and applieseach record once into governed data 09 Data store Governed product through API, map orexport, correction-aware 10 Products IEC 61850DNP3 (IEEE 1815)IEEE 1547 11 Power and structure Supplies 12 V DC, 24 V DC, 48 V DC to thefield equipment Feeder devices and IEDs Not in the reference kit 01 Energy and power-quality meter SDI-12 · RS-485 · Ethernet 02 Compact weather station SDI-12 · RS-485 · Ethernet 03 OT gateway (OPC UA, Modbus) Ethernet · RS-485 · CAN · AnalogueI/O LTE routers on poles Not in the reference kit 04 Small cell (4G/5G) Ethernet · Fibre · GNSS antenna ·1PPS/10 MHz 05 5G core appliance (UPF/core) Ethernet · Fibre · BMC 06 Zero-trust gateway Ethernet · Fibre 07 Fibre terminal Fibre · Ethernet Site MQTT 5 with Sparkplug B Governed data store Versioned, correction-aware Feeder visibility: voltage,load and resources Located faults with evidence Transformer health andloading Outage and reliability records Private network performance 08 Battery case USB 09 Pole Ethernet · IEC 61850 RS-485 · Modbus RS-485 · Modbus Ethernet LTE/NR Ethernet Ethernet Fibre Fibre
From the instrument to the published product: each band is a tier, each connector names its interface, and the numbers match the bill of materials. Hover or focus a block to trace its path; scroll or step to follow one observation.
Bill of materials
ItemEquipmentData portsProtocolsPower in
01Energy and power-quality meterMeter for voltage, current, power, energy and power quality at a site or on a feeder.SDI-12RS-485EthernetModbus, IEC 61850 (MMS, GOOSE), DNP3 (IEEE 1815), MQTT 512 V DC
02Compact weather stationAll-in-one or compact station for temperature, humidity, pressure, wind and rain at a site.SDI-12RS-485EthernetSDI-12, Modbus, MQTT 5, OGC SensorThings API12 V DC
03OT gateway (OPC UA, Modbus)Read-only bridge from industrial fieldbuses and controllers (Modbus, OPC UA, DNP3, IEC 61850, CAN) to the site network, behind a security boundary.EthernetRS-485CANAnalogue I/OOPC UA, Modbus, DNP3 (IEEE 1815), IEC 61850 (MMS, GOOSE), MQTT 524 V DC
04Small cell (4G/5G)Integrated base station (radio, baseband, antenna) for private LTE or NR on a local licence, shared-spectrum or leased route. A CBRS CBSD is a small cell that also registers with a spectrum access system.EthernetFibreGNSS antenna1PPS/10 MHz3GPP NR air interface, 3GPP E-UTRA air interface, IEEE 1588 PTP, O-RAN E2, A1, O1PoE, 48 V DC, AC mains
055G core appliance (UPF/core)Local 5G standalone core with user-plane function and local breakout, so site traffic stays on site.EthernetFibreBMC3GPP 5G core service-based interfaces, DMTF RedfishAC mains, 48 V DC
06Zero-trust gatewayGateway that terminates encrypted tunnels, enforces segmentation and gates every flow by identity and policy.EthernetFibre—12 V DC, AC mains
07Fibre terminalOptical network terminal or media converter that lands fibre backhaul at a site.FibreEthernetIEEE 1588 PTP12 V DC, 48 V DC, AC mains
08Battery casePortable battery pack with DC outputs for field kits.USBModbusAC mains, HV DC, USB PD
09PoleUtility, street or dedicated pole with clamp positions.———

How it scales

01 Instruments Arbitrary qualified sensors and instruments whosemeasurements are ingested with calibration, units,geometry, time, custody and uncertainty. ×n 02 Node The minimum useful deployable unit: server, ruggedappliance, radio node, sensor gateway, satelliteterminal, AI, scientific, vehicle or virtual node. Node Node agent 03 Site The minimum independently operable localgovernance and failure domain: one or more nodesplus local network, identity, policy, evidence,storage, products and operator surfaces.

SITE

Node Node Node ×n 04 Cluster An optional scale or specialisation domain forscheduling, shared storage, accelerators or datalocality.

CLUSTER

×n 05 Fleet Coordinates plans, acknowledgements,convergence evidence, update campaigns andcorrection propagation across nodes and sites.

FLEET

Fleet controller ×n 06 Federation An exchange of products, capabilities, events orwork across approved, independently administeredtrust domains, using explicit trust, policy,data-locality, version and correction contracts.

TRUST DOMAIN

TRUST DOMAIN

TRUST DOMAIN

×n Verifier Applications Data in the field Telemetry Control Data upstream Control Data upstream Control Exchange Evidence Events Exchange
The smallest deployable unit is one node; the same unit is replicated to meet the demand. Nodes form a site, sites may form a cluster, sites and clusters are coordinated as a fleet, and fleets exchange across independently administered trust domains. Each plane is a separate channel with its own open binding.
Data in the field
MQTT 5 with Sparkplug B; connectors for LoRaWAN, OPC UA and instrument buses.
Telemetry
OpenTelemetry OTLP.
Control
TLS 1.3 with mutual authentication; protobuf messages over gRPC or HTTP/2.
Data upstream
At-least-once publication with repeat-safe keys over the control channel or NATS JetStream; QUIC MAY be used on lossy links.
Evidence
DSSE-signed in-toto statements; SLSA provenance; SCITT transparency receipts.
Events
Event envelopes mapped to CloudEvents 1.0; channels described in AsyncAPI 3.
Exchange
OpenAPI 3.1; the OGC API family; SensorThings; STAC; WIS 2.0.

05From order to operation

Every step, from the first call to a running site.

The same crew and the same record carry the work from scope to maintenance.

  1. 01 Order

    Scope feeders and goals

    The scope reads the utility’s reliability goals, distributed resource growth, wildfire risk areas and existing automation. Nexus Observatory Inc. returns a device plan per feeder class, the private network design, the integration with operations and a price per feeder and per substation. 4

  2. 02 Survey

    Survey feeders and radio sites

    Crews survey representative feeders, poles, transformers and substations with distribution and telecom engineers. They measure radio coverage, choose radio sites, check pole loading and power, and record each device position against the utility’s asset records. Feeders are chosen to represent the network’s classes, so the design repeats.

  3. 03 Permits

    Spectrum, poles and security

    The private network uses spectrum the utility holds or leases; pole attachments follow the utility’s standards; every field device joins only through the utility’s security programme. Changes to protection follow the utility’s procedures. Every device is registered in the asset records before it joins. 67

  4. 04 Build

    Build devices by class

    Pole stations, gateways, modems, transformer monitors and radio sites are built and tested by class, enrolled with their identities and labelled with asset numbers, so each device appears in the right place in the utility’s records from the first reading.

  5. 05 Install

    Install feeder by feeder

    Radio sites go in first, then pole stations, sensors and transformer monitors along each feeder under live-line or planned-outage procedures. Each installation is checked against the asset record and photographed. Crews follow the utility’s own work methods, and customers on affected feeders are told about planned outages in advance.

  6. 06 Commission

    Commission devices and fault logic

    Each device proves its identity and is checked against the substation’s measurements; fault location is tested against known events or tests; voltage logic runs in observation before it acts. Coverage and latency are measured and recorded per device. Results are signed into each device’s record.

  7. 07 Operate

    See the feeder, restore faster

    Operators see voltage, load and resources along each feeder, located faults with their evidence and device health across the network. Restoration and voltage actions are logged, and outage records support reliability reporting. Field crews see the same located fault on their devices, so they drive to the right section first.

  8. 08 Maintain

    Grow with the grid edge

    Devices are added as feeders grow and resources connect, software and security updates move in rings, and radio sites are added where coverage is needed. Every change updates the asset and network records. Devices that fall silent are visible at once, and their last readings stay in the record.

06Data products and integration

What it delivers, to whom, and into which systems.

Data products

  • Feeder visibility: voltage, load and resourcesDistribution operators and planners
  • Located faults with evidenceControl rooms and field crews
  • Transformer health and loadingAsset managers
  • Outage and reliability recordsRegulatory and reliability teams
  • Private network performanceTelecom teams

Integration

  • Distribution management and outage systemsDevice data and events follow IEC 61850 and DNP3 into the control room’s systems.
  • Asset management and GISEvery device is tied to the utility’s asset records and maps.
  • Resource aggregatorsDistributed resource data is exchanged under the interconnection rules and agreements.

Exchanged through IEC 61850, DNP3 (IEEE 1815), IEEE 1547.

07Questions buyers ask

Before you scope it.

Do we need our own spectrum?

A private network needs licensed, shared or leased spectrum; the plan sets out the route available to you.

Can it work with our existing reclosers and meters?

Usually yes. Devices with standard utility protocols are read through gateways, and their data joins the same record.

How is security handled?

Every device has a hardware identity, joins only after attestation and talks only through the utility’s security gateways.

Where do we start?

Most utilities start with the feeders where distributed resources, reliability or wildfire risk demand it most.

08Resources

The sources behind this page.

Public standards, regulations and guidance, cited where they apply. Each applies only where its jurisdiction or scope does.

  1. 1IEC 61850: Communication networks and systems for power utility automationInternational Electrotechnical Commission
  2. 2IEEE 1815: Distributed Network Protocol (DNP3)IEEE Standards Association
  3. 3ISO 55000: Asset management, vocabulary, overview and principlesInternational Organization for Standardization
  4. 4IEEE 1547: Interconnection and interoperability of distributed energy resourcesIEEE Standards Association
  5. 5Guide to Instruments and Methods of Observation (WMO-No. 8)World Meteorological Organization
  6. 6TS 23.501: System architecture for the 5G System, including non-public networks3GPP
  7. 7ISA/IEC 62443 series: security for industrial automation and control systemsISA and IEC

09Related

Use cases and solutions.

Use case

Utility grid-edge private LTE and wildfire weather

Private LTE on substations and poles for distribution automation, with weather nodes that inform public-safety power shutoff decisions.The full use case →
Use case

Remote microgrid observatory

Solar, storage and power-quality telemetry with a weather station and a small cell, for a community that is reducing diesel.The full use case →
Solution

Power-grid edge and right-of-way monitoring

Line temperature and sag, vegetation encroachment from EO and LiDAR, substation sensors and fire-weather at the right-of-way.Solutions for energy →
Solution

Private Wireless as a Service

Standalone private 5G or LTE for a site, campus, port or mine: radios, core, SIMs, spectrum route and operations.Solutions for energy →
Solution

Private and federated observing grids

Design and operation of an organisation’s own grid on the open protocol, with provider admission, device qualification and federation across trust domains.Solutions for energy →

10Energy: specialized fields

Other fields of this industry.

Specialized field

Upstream oil and gas

Methane detection and quantification at wellpads and facilities, flare and tank monitoring, wellhead flow and pressure, on satellite and private links for sites with no one on them.The full field →
Specialized field

Pipelines and midstream

Leak detection, cathodic protection, pressure and flow along the line, geohazards at crossings and compressor and pump stations, on LoRaWAN, satellite and private links over hundreds of kilometres.The full field →
Specialized field

Thermal power plants

Continuous emissions, machine condition, cooling water and plant weather for gas, coal and biomass plants, with an industrial network that keeps the control system separate and secure.The full field →
Specialized field

Hydropower and dams

Dam safety instruments, reservoir and river levels, inflow forecasting and downstream warning, with links that keep working in the flood the dam is there to hold.The full field →
Specialized field

Wind farms

Wind resource and power performance, turbine condition, icing, lightning and wildlife monitoring, from the first met mast to an operating farm on one record.The full field →
Specialized field

Solar power plants

Irradiance, module temperature, soiling, inverter output and plant weather to international monitoring classes, for bankable performance ratios and fewer surprises in operation.The full field →
Specialized field

Transmission networks

Line ratings from measured weather and conductor state, wildfire and vegetation watch, substation automation and synchrophasor timing, on private LTE, microwave and fibre along the corridor.The full field →