Power, energy and ruggedisation
Hybrid microgrid planning
Combining PV, wind, storage and generators into an isolated or grid-tied site microgrid.
We design and deploy.
IEC TS 62898-1 (microgrid planning and specification)
/
Hardware & power/
PowerPower, inside Hardware & power: hybrid microgrid planning, microgrid controllers, grid interconnection, -48 V DC telecom power and more. Every item is traced to its specification, from IEC TS 62898-1 (microgrid planning and specification) to IEEE 2030.7 (microgrid controller specification), and runs on the open Observatory Protocol.
Plan with usArchitectureThe protocolReference design, drawn to scale · drag to turn · hover a part
01What it is
How a remote site is powered, stored, distributed, cooled, sealed, tested, grounded, held up and kept safe, from a solar-powered sensor to a hybrid microgrid on a guyed mast. Each technology below carries what it is, what we do with it, and the standard it is drawn against.
Power, energy and ruggedisation
Combining PV, wind, storage and generators into an isolated or grid-tied site microgrid.
We design and deploy.
IEC TS 62898-1 (microgrid planning and specification)
Power, energy and ruggedisation
Dispatch, islanding and generator scheduling with tested control functions.
We design, integrate, deploy and operate.
IEEE 2030.7 (microgrid controller specification) · IEEE 2030.8 (microgrid controller testing)
Power, energy and ruggedisation
Connecting site generation to the utility with protection and ride-through settings.
We design and deploy.
IEEE 1547-2018 · CSA C22.3 No. 9 (interconnection of distributed resources)
Power, energy and ruggedisation
The standard DC interface for radio and network equipment, with rectifiers and battery strings.
We design, deploy and maintain.
ETSI EN 300 132-2
Power, energy and ruggedisation
Up to 400 V DC to cut cable losses across masts and edge racks.
We design.
ETSI EN 300 132-3
Power, energy and ruggedisation
Power and data on one cable for cameras, radios and access points up to about 90 W.
We design, integrate and deploy.
IEEE 802.3bt-2018 (Type 3 and 4)
Power, energy and ruggedisation
Long-reach 10 Mb/s links with power over one pair for field instruments.
We design and integrate.
IEEE 802.3cg (10BASE-T1L) · IEEE 802.3bu (PoDL)
Power, energy and ruggedisation
Ride-through and clean power for compute and network loads.
We design, deploy and maintain.
IEC 62040-3 (UPS performance)
Power, energy and ruggedisation
Power for vehicle-mounted and deployable systems with transient protection.
We design and integrate.
ISO 16750-2 (road vehicle electrical loads) · MIL-STD-1275 (28 V DC vehicle systems)
02Architecture
Power draws on 1 domain and 8 layers of the spectrum; the highlighted layers carry this area. It speaks 3 of the protocol’s 8 core functions.
Generation
9
Storage
9
Microgrids and distribution
9
Energy management and monitoring
7
Thermal design and ingress
8
Environmental and EMC testing
7
Lightning, grounding and structures
8
Safety and transport
7
01JoinIdentity, attestation quote, signed policy.
02AdmitAdmitted for a stated scope, nothing wider.
03DescribeWhat, where, how and by whom, with calibration.
04TimeOne clock across the grid, with its error bound.
05ObserveEvery value with quality and provenance.
06QualifyTested against the specification, state on record.
07FederateSigned exchange across grids and trust domains.
08OrchestrateSoftware and configuration by signed plan.
03On the grid
The open networks on the grid today, over real relief and the geodesic cells we count them into, filtered to the energy industry domain this area serves. A site built here enrols into the same grid.
04In the field
6 deployment scenarios from the sector research that rely on power.
Cities05Open and enterprise
The open counterpart lives on the main site for anyone to read and run. The enterprise service is designed, deployed and operated with you, under contract.
Open, on the main site
Enterprise, on this site
06The rest of the line
Survey, design, deployment and operation for power. The form names who receives your details.
Talk to uscontact@observatory.globalPower, inside Hardware & power: hybrid microgrid planning, microgrid controllers, grid interconnection, -48 V DC telecom power and more. Every item is traced to its specification, from IEC TS 62898-1 (microgrid planning and specification) to IEEE 2030.7 (microgrid controller specification), and runs on the open Observatory Protocol.
The open counterpart lives on the main site for anyone to read and run. The enterprise service is designed, deployed and operated with you, under contract.
Global Privacy Control detected. We have honored it as your request to opt out of the sale and sharing of your personal information and of targeted advertising.Signal Global Privacy Control détecté. Nous l'avons respecté comme une demande d'opposition à la vente et à la communication de vos renseignements personnels ainsi qu'à la publicité ciblée.
Cookie policyPolitique relative aux témoins Privacy policyPolitique de confidentialité Do Not Sell or Share My Personal InformationNe pas vendre ni communiquer mes renseignements personnels
Your browser sent a Global Privacy Control signal. We treat it as a refusal for the purposes marked below, and those switches stay off.Votre navigateur a envoyé un signal Global Privacy Control. Nous le traitons comme un refus pour les finalités indiquées ci-dessous, et ces interrupteurs restent désactivés.
Needed for the site to work, to keep you signed in, to protect it from attacks and to remember your privacy choices and the settings you pick. Always on.Nécessaires au fonctionnement du site, pour vous garder connecté, le protéger contre les attaques et retenir vos choix de confidentialité et les réglages que vous choisissez. Toujours actifs.
Remember optional settings beyond the ones you pick yourself. Off until you allow it.Retenir des réglages facultatifs autres que ceux que vous choisissez vous-même. Désactivés tant que vous ne les autorisez pas.
Count visits and see how pages are used, so we can improve the site. Off until you allow it.Compter les visites et voir comment les pages sont utilisées, afin d'améliorer le site. Désactivés tant que vous ne les autorisez pas.
Show videos, maps and live data layers from other providers. They receive your IP address and may set their own cookies. Off until you allow it, or load a single item once.Afficher des vidéos, des cartes et des couches de données en direct d'autres fournisseurs. Ceux-ci reçoivent votre adresse IP et peuvent déposer leurs propres témoins. Désactivés tant que vous ne les autorisez pas, ou chargez un seul élément une fois.
Measure campaigns and personalise advertising. We use none today. Off until you allow it, and refused when your browser sends Global Privacy Control.Mesurer les campagnes et personnaliser la publicité. Nous n'en utilisons aucun actuellement. Désactivés tant que vous ne les autorisez pas, et refusés lorsque votre navigateur transmet le signal Global Privacy Control.
Nexus Observatory Inc. keeps a record of each choice as proof: a random consent ID, the time, your region and the rules applied, the choices, the notice shown, the page, a shortened IP address, a one-way code of your browser type and, if you are signed in, your account. Records are kept while your choice applies and for 3 years after, then deleted.Nexus Observatory Inc. conserve un registre de chaque choix à titre de preuve : un identifiant de consentement aléatoire, l'heure, votre région et les règles appliquées, les choix, l'avis affiché, la page, une adresse IP abrégée, un code à sens unique du type de navigateur et, si vous êtes connecté, votre compte. Les registres sont conservés tant que votre choix s'applique et pendant 3 ans par la suite, puis supprimés.