Skip to content
Nexus Observatory

/

Civil resilience

/

Specialized fields

/

Backup power at critical sites

Backup power that starts when it is needed.

When the grid fails, hospitals, water plants, emergency centres and telecom hubs run on generators and batteries. Many fail to start, run out of fuel or trip under load. Monitoring every generator, tank, battery and transfer switch, with tests on record, turns backup power from a hope into a fact.

Plan a deploymentHow it worksStation Builder
Industry
Civil resilience
Measurements
5
Sources cited
2
  1. Civil resilience · Backup power at critical sites

    The outage is the test

    When the grid fails, hospitals, water plants, emergency centres and telecom hubs run on generators and batteries. Too often a generator does not start after months idle, a tank is low, or a battery no longer holds. Standards ask for regular tests; between them, backup power is usually watched by no one.

  2. What is measured

    Engine, fuel, battery and switch

    Meters read generator output and load, sensors read fuel level and quality in day and bulk tanks, battery systems report state and runtime, contacts read the transfer switch position, and engine sensors read vibration and temperature during every run and test.

    Instruments
    Power meters · Fuel sensors · Battery monitors · Switch contacts · Engine sensors
  3. The base node

    Runtime, computed

    The node computes how long each site can run from fuel, load and battery state, detects failed starts and failed transfers, flags fuel quality problems and engine faults, and records every test and outage automatically, so the evidence inspectors ask for is complete.

  4. Radio and links

    Reporting through the blackout

    Cellular carries power state from each site and survives grid outages where cell sites have their own backup. Sites that must report through long regional blackouts add a satellite path. The monitor runs on the site’s protected supply, so it reports the outage it is there to watch.

    Links
    Public cellular · Satellite
  5. How it works

    From a blackout to a fuel truck

    A storm blacks out a region. Generators start at forty sites; one fails, and its crew is sent at once. The emergency centre sees runtime at every site, and fuel trucks go first to the water plant and the hospital with the shortest time left.

  6. From order to operation · Order

    Scope the critical load

    The scope reads each site’s critical loads, its generators, tanks, batteries and switches, test records, outage history and the fuel contracts. Nexus Observatory Inc. returns the monitoring kit per site, the runtime and fuel model, test reporting and a price per site and per year.

    Plan a deployment
  7. From order to operation · Survey

    Survey every power room

    Crews survey generator rooms, tank farms, battery rooms and switchboards with the site engineers: controller interfaces, tank access for sensors, meter points, switch contacts and backhaul coverage. Each finding is recorded with photographs and single-line drawings. Findings shape the kit for each site before anything is built.

  8. From order to operation · Permits

    Electrical safety and permits

    Work on switchboards and generator controllers follows the site’s electrical safety rules and permits to work, often in planned windows for hospitals and plants. Fuel system work follows the fire safety rules for flammable liquids. Every permit is kept with the site record.

  9. From order to operation · Build

    Build to the site’s single line

    Kits are built to each site’s single-line diagram: meters, fuel sensors, contacts and engine sensors mapped to the gateway, nodes enrolled with their identities and configured with tank sizes and loads. Everything is tested together before shipping. Nothing ships until the whole kit has passed its tests together.

    Open the Station Builder
  10. From order to operation · Install

    Install in planned windows

    Crews fit meters, fuel sensors, transfer switch contacts and engine sensors during planned windows, with critical loads protected throughout. Gateways and nodes are mounted in the power room, backhaul is connected and every point is photographed. Crews follow the site safety plan throughout the work.

  11. From order to operation · Commission

    Commission with a load test

    Each node proves its identity. A planned load test starts each generator, transfers the load, runs it and transfers back, while every reading is checked against the controller and runtime is compared with fuel actually used. Results go into the test record.

  12. From order to operation · Operate

    Know the runtime

    Operators see every site’s generators, fuel, batteries and runtime. In an outage, fuel deliveries go first to the sites with the shortest runtime, failed starts send crews at once, and every test and outage is recorded for inspectors and regulators.

  13. From order to operation · Maintain

    Test on schedule, keep the record

    Scheduled generator tests and battery checks are recorded automatically, fuel is sampled and polished when quality drops, engine trends schedule servicing, and node software updates roll out in rings. Every test and repair is kept with the site. Maintenance history stays with each site for its whole life.

    Book field services
  14. Data products

    For managers, crews and suppliers

    Emergency managers and site operators receive runtime at every site; maintenance crews receive failed start and transfer alarms; fuel suppliers receive fuel needs by site; inspectors, auditors and regulators receive test and outage records, each tied to the site, the generator and the time.

    See the data products
  15. Evidence

    Tests and outages on record

    Monitoring and test records follow the emergency and standby power standard, generators are assessed against the generating set series, and records support the resilience duties of critical entities. Every start, transfer, test and outage is signed and kept, ready for inspection.

    Drawn against
    NFPA 110 · ISO 8528 · Directive (EU) 2022/2557
  16. What you get

    Microgrids and off-grid site power

    PV, storage and generator sizing for instruments and edge sites, with telemetry and remote control. Delivered as hardware + software and managed service, for remote sites, telecom, agencies, communities. Scale: Per site; fleets. Service levels are written as numbers you can measure on your own dashboard.

    Talk to sales
  17. Next step

    Plan backup power at critical sites with us

    Tell us the site, the measurements and the rules it answers to. We reply with a survey proposal, a design and a scope for backup power at critical sites. An engineer replies with a survey proposal and a scope, and the plan grows from one site to the network you need, at your pace.

    Plan a deploymentOpen the Station BuilderOpen the Studio

01The place and its hazards

Where it runs, and what can go wrong.

Operating contextEmergency and standby power systems are designed, tested and maintained to their own standards, generating sets are rated to the international generator series, and operators of critical entities must show their services survive disruption. Yet backup power is often tested rarely and watched by no one between tests.

Hazards

  • Generators that fail to start after months idle
  • Fuel that runs out, degrades or is stolen
  • Batteries that no longer hold their rated time
  • Transfer switches that fail to transfer
  • Long outages that outlast the fuel on site

02What must be measured

What, where, how often, and under which rules.

Each measurement names where it is taken, how often, and the public standard or regulation behind it. Numbers in the sources column open the cited source below.

MeasurementWhereCadenceSources
Generator start, run and loadEach generator’s controllerContinuous, events on start and stop12
Fuel level and qualityDay tanks and bulk tanksContinuous1
Battery state and runtimeUninterruptible power and DC battery systemsContinuous1
Transfer switch state and transfer timeEvery automatic transfer switchOn event and in tests1
Engine vibration and temperatureGenerator engine and alternatorDuring runs2

03The observation stack

From one base unit to a network.

The same blocks at every scale: instruments and a base node, a site with its radio, a fleet run as one, and a network federated on the open protocol.

  1. 01

    Base unit

    A power point: meters, fuel sensors, transfer switch contacts and engine sensors on an industrial gateway with a node.

    Build a station →
  2. 02

    Site

    A site: every generator, tank, battery and transfer switch of one hospital, plant or hub, with its own backhaul.

    Plan a site →
  3. 03

    Fleet

    Every critical site of an operator or a city watched as one fleet, with fuel and runtime across all of them.

    Managed offers →
  4. 04

    Network

    Emergency managers and fuel suppliers share runtime and fuel needs across operators through open standards.

    The open protocol →
  • 01Energy and power-quality meter
  • 02Vibration and condition monitor
  • 03OT gateway (OPC UA, Modbus)
  • 04Edge node (Wedge)
  • 05Cellular modem/router
  • 06Generator
  • 07Battery case

Radio and links

Public cellular

Cellular carries power state from each site; it survives grid outages where cell sites have their own backup.

Radio and links

Satellite

Sites that must report through long regional outages add a satellite path.

Edge computeThe node computes runtime from fuel, load and battery state, detects failed starts and transfers, flags fuel quality problems and engine faults during runs, and records every test and outage.

PowerThe monitoring runs on the site’s protected supply with its own battery, so it reports the outage that it is there to watch.

04How it works

From the instrument to the product.

One observation’s path, tier by tier, with the interface on every link and a bill of materials below; then how the one node grows to a site, a fleet and federated networks.

Backup power at critical sites: data path

– of 07

01 Instruments Measurement with sensor identity andcalibration 02 Gateway 03 Node – Wrap in an observation envelope with timequality– Measure quality and uncertainty, attachquality flags– Buffer locally (store-and-forward when thelink drops) 04 Backhaul Commit with transactional outbox andpublish, delivered at least once 05 Site Consumer inbox deduplicates and applieseach record once into governed data 06 Data store Governed product through API, map orexport, correction-aware 07 Products ModbusOPC UAMQTT 08 Power and structure Supplies 12 V DC, 24 V DC, 48 V DC to thefield equipment 01 Energy andpower-quality meter SDI-12 · RS-485 · Ethernet 02 Vibration and conditionmonitor Analogue I/O · RS-485 ·Ethernet 03 Generator RS-485 · Ethernet Fuel level and quality sensorsin day and bulk tanks Not in the reference kit Transfer switch positioncontacts Not in the reference kit 04 OT gateway (OPC UA, Modbus) Ethernet · RS-485 · CAN · AnalogueI/O 05 Edge node (Wedge) Ethernet · Fibre · USB · RS-485 ·BMC 06 Cellular modem/router Ethernet · USB · RS-232 Site MQTT 5 with Sparkplug B Governed data store Versioned, correction-aware Runtime at every site Failed start and transfer alarms Fuel needs by site Test and outage records 07 Battery case USB RS-485 · Modbus RS-485 · Modbus RS-485 · Modbus Analogue I/O Analogue I/O Ethernet · opc-ua Ethernet LTE/NR
From the instrument to the published product: each band is a tier, each connector names its interface, and the numbers match the bill of materials. Hover or focus a block to trace its path; scroll or step to follow one observation.
Bill of materials
ItemEquipmentData portsProtocolsPower in
01Energy and power-quality meterMeter for voltage, current, power, energy and power quality at a site or on a feeder.SDI-12RS-485EthernetModbus, IEC 61850 (MMS, GOOSE), DNP3 (IEEE 1815), MQTT 512 V DC
02Vibration and condition monitorAccelerometer-based vibration and temperature sensor for rotating machinery and structural condition monitoring.Analogue I/ORS-485EthernetModbus, OPC UA, MQTT 512 V DC
03GeneratorFuel generator with automatic start for backup or primary site power.RS-485EthernetModbusFuel
04OT gateway (OPC UA, Modbus)Read-only bridge from industrial fieldbuses and controllers (Modbus, OPC UA, DNP3, IEC 61850, CAN) to the site network, behind a security boundary.EthernetRS-485CANAnalogue I/OOPC UA, Modbus, DNP3 (IEEE 1815), IEC 61850 (MMS, GOOSE), MQTT 524 V DC
05Edge node (Wedge)Rugged edge node that boots from signed media, attests itself and establishes a site cell from little or no infrastructure.EthernetFibreUSBRS-485BMCMQTT 5, DMTF Redfish, IEEE 1588 PTP, NTP with NTS, OPC UA12 V DC, 24 V DC, 48 V DC, AC mains
06Cellular modem/routerLTE or NR modem or router that uses a public carrier or private network as backhaul.EthernetUSBRS-2323GPP E-UTRA air interface, 3GPP NR air interface, OMA LwM2M12 V DC, PoE
07Battery casePortable battery pack with DC outputs for field kits.USBModbusAC mains, HV DC, USB PD

How it scales

01 Instruments Arbitrary qualified sensors and instruments whosemeasurements are ingested with calibration, units,geometry, time, custody and uncertainty. ×n 02 Node The minimum useful deployable unit: server, ruggedappliance, radio node, sensor gateway, satelliteterminal, AI, scientific, vehicle or virtual node. Node Node agent 03 Site The minimum independently operable localgovernance and failure domain: one or more nodesplus local network, identity, policy, evidence,storage, products and operator surfaces.

SITE

Node Node Node ×n 04 Cluster An optional scale or specialisation domain forscheduling, shared storage, accelerators or datalocality.

CLUSTER

×n 05 Fleet Coordinates plans, acknowledgements,convergence evidence, update campaigns andcorrection propagation across nodes and sites.

FLEET

Fleet controller ×n 06 Federation An exchange of products, capabilities, events orwork across approved, independently administeredtrust domains, using explicit trust, policy,data-locality, version and correction contracts.

TRUST DOMAIN

TRUST DOMAIN

TRUST DOMAIN

×n Verifier Applications Data in the field Telemetry Control Data upstream Control Data upstream Control Exchange Evidence Events Exchange
The smallest deployable unit is one node; the same unit is replicated to meet the demand. Nodes form a site, sites may form a cluster, sites and clusters are coordinated as a fleet, and fleets exchange across independently administered trust domains. Each plane is a separate channel with its own open binding.
Data in the field
MQTT 5 with Sparkplug B; connectors for LoRaWAN, OPC UA and instrument buses.
Telemetry
OpenTelemetry OTLP.
Control
TLS 1.3 with mutual authentication; protobuf messages over gRPC or HTTP/2.
Data upstream
At-least-once publication with repeat-safe keys over the control channel or NATS JetStream; QUIC MAY be used on lossy links.
Evidence
DSSE-signed in-toto statements; SLSA provenance; SCITT transparency receipts.
Events
Event envelopes mapped to CloudEvents 1.0; channels described in AsyncAPI 3.
Exchange
OpenAPI 3.1; the OGC API family; SensorThings; STAC; WIS 2.0.

05From order to operation

Every step, from the first call to a running site.

The same crew and the same record carry the work from scope to maintenance.

  1. 01 Order

    Scope the critical load

    The scope reads each site’s critical loads, its generators, tanks, batteries and switches, test records, outage history and the fuel contracts. Nexus Observatory Inc. returns the monitoring kit per site, the runtime and fuel model, test reporting and a price per site and per year. 1

  2. 02 Survey

    Survey every power room

    Crews survey generator rooms, tank farms, battery rooms and switchboards with the site engineers: controller interfaces, tank access for sensors, meter points, switch contacts and backhaul coverage. Each finding is recorded with photographs and single-line drawings. Findings shape the kit for each site before anything is built.

  3. 03 Permits

    Electrical safety and permits

    Work on switchboards and generator controllers follows the site’s electrical safety rules and permits to work, often in planned windows for hospitals and plants. Fuel system work follows the fire safety rules for flammable liquids. Every permit is kept with the site record.

  4. 04 Build

    Build to the site’s single line

    Kits are built to each site’s single-line diagram: meters, fuel sensors, contacts and engine sensors mapped to the gateway, nodes enrolled with their identities and configured with tank sizes and loads. Everything is tested together before shipping. Nothing ships until the whole kit has passed its tests together.

  5. 05 Install

    Install in planned windows

    Crews fit meters, fuel sensors, transfer switch contacts and engine sensors during planned windows, with critical loads protected throughout. Gateways and nodes are mounted in the power room, backhaul is connected and every point is photographed. Crews follow the site safety plan throughout the work.

  6. 06 Commission

    Commission with a load test

    Each node proves its identity. A planned load test starts each generator, transfers the load, runs it and transfers back, while every reading is checked against the controller and runtime is compared with fuel actually used. Results go into the test record. 12

  7. 07 Operate

    Know the runtime

    Operators see every site’s generators, fuel, batteries and runtime. In an outage, fuel deliveries go first to the sites with the shortest runtime, failed starts send crews at once, and every test and outage is recorded for inspectors and regulators. 1

  8. 08 Maintain

    Test on schedule, keep the record

    Scheduled generator tests and battery checks are recorded automatically, fuel is sampled and polished when quality drops, engine trends schedule servicing, and node software updates roll out in rings. Every test and repair is kept with the site. Maintenance history stays with each site for its whole life. 1

06Data products and integration

What it delivers, to whom, and into which systems.

Data products

  • Runtime at every siteEmergency managers and site operators
  • Failed start and transfer alarmsMaintenance crews
  • Fuel needs by siteFuel suppliers and logistics
  • Test and outage recordsInspectors, auditors and regulators

Integration

  • Building managementPower state reaches the site’s building management system through its own interfaces.
  • MaintenanceFailed starts and engine trends open work orders.
  • Emergency managementRuntime and fuel needs are shared with the emergency operations centre during regional outages.

Exchanged through Modbus, OPC UA, MQTT.

07Questions buyers ask

Before you scope it.

Does it replace generator tests?

No. It records every test and watches between them.

Can it see fuel theft?

Sudden level drops without running are flagged.

Will it work in a regional blackout?

It runs on protected power, and satellite can be added.

Which generators does it support?

Most controllers expose their data; others are read through meters and contacts.

08Resources

The sources behind this page.

Public standards, regulations and guidance, cited where they apply. Each applies only where its jurisdiction or scope does.

  1. 1NFPA 110: Standard for Emergency and Standby Power SystemsNational Fire Protection Association
  2. 2ISO 8528: Reciprocating internal combustion engine driven alternating current generating setsInternational Organization for Standardization

09Related

Use cases and solutions.

Use case

Remote microgrid observatory

Solar, storage and power-quality telemetry with a weather station and a small cell, for a community that is reducing diesel.The full use case →
Solution

Microgrids and off-grid site power

PV, storage and generator sizing for instruments and edge sites, with telemetry and remote control.Solutions for civil resilience →
Solution

Structural and ground-movement monitoring

GNSS, InSAR, tilt, strain and fibre sensing on bridges, dams, slopes, tailings and pipelines, with alert thresholds set by the owner.Solutions for civil resilience →
Solution

Power-grid edge and right-of-way monitoring

Line temperature and sag, vegetation encroachment from EO and LiDAR, substation sensors and fire-weather at the right-of-way.Solutions for civil resilience →

10Civil resilience: specialized fields

Other fields of this industry.

Specialized field

Critical site security

Perimeter, intrusion and operational-technology monitoring for substations, pumping stations and other unstaffed critical sites, so operators see a threat to the site and its control systems at once.The full field →
Specialized field

Timing integrity

Time references with holdover and monitoring for grids, telecom and finance, so a country’s critical systems keep accurate time when satellite signals are jammed, spoofed or lost.The full field →
Specialized field

Northern and Arctic observing

Weather, permafrost, ground movement and river and lake ice stations for northern civil authorities, built for polar night, deep cold and satellite-only backhaul.The full field →

Bring us the site.

Plan a deployment, configure a station, model it in the Studio or talk to sales. The form names who receives your details.

Plan a deploymentStation BuilderOpen the StudioTalk to salesRequest a quote