Field operations and lifecycle
Decommission planning
Removing equipment, restoring the site and closing licences and leases.
We design and deploy.
ISO 55001:2024 · ISO 14001:2015
/
Field services/
DecommissionDecommission, inside Field services: decommission planning, electronic waste, battery end of life, transboundary waste movement and more. Every item is traced to its specification, from ISO 55001:2024 to ISO 14001:2015, and runs on the open Observatory Protocol.
Plan with usArchitectureThe protocolReference design, drawn to scale · drag to turn · hover a part
01What it is
Everything that happens on the ground across a site’s life: survey, permits, design packs, logistics, installation, acceptance, training, operations, maintenance, upgrades, decommission and recycling, done safely and recorded as evidence. Each technology below carries what it is, what we do with it, and the standard it is drawn against.
Field operations and lifecycle
Removing equipment, restoring the site and closing licences and leases.
We design and deploy.
ISO 55001:2024 · ISO 14001:2015
Field operations and lifecycle
Collection and treatment of electrical and electronic equipment through approved channels.
We deploy.
Directive 2012/19/EU (WEEE) · EN 50625 series (WEEE treatment) · Canadian provincial extended producer responsibility programmes
Field operations and lifecycle
Return, recycling and documentation for lithium and lead-acid batteries.
We deploy.
Regulation (EU) 2023/1542 (batteries) · UN 38.3 (for transport of used cells)
Field operations and lifecycle
Controls on moving hazardous and electronic waste between countries.
We deploy.
Basel Convention
Field operations and lifecycle
Knowing what each product contains for safe recycling.
We design.
Directive 2011/65/EU (RoHS) · IEC 62474 (material declaration)
Field operations and lifecycle
Erasing or destroying storage so no data leaves with retired equipment.
We deploy.
NIST SP 800-88 (media sanitisation)
Frontier · Field operations and lifecycle
Machine-readable records of materials, repair and recycling per product.
We design.
Regulation (EU) 2024/1781 (Ecodesign for Sustainable Products)
Field operations and lifecycle
Ranking candidate sites from terrain, hazards, access, power, land use and coverage before anyone travels.
We design and operate.
OGC API – Processes (siting runs) · Analytic Hierarchy Process (Saaty)
Field operations and lifecycle
Measuring existing signals, interference and link paths at the candidate site.
We design, deploy and operate.
ITU-R SM.1880 (spectrum occupancy measurement) · ITU-R P.530 (line-of-sight links)
02Architecture
Decommission draws on 1 domain and 8 layers of the spectrum; the highlighted layers carry this area. It speaks 3 of the protocol’s 8 core functions.
Survey and site acquisition
8
Permitting and approvals
7
Design packs and logistics
8
Installation, commissioning and acceptance
9
Operations, NOC, support and training
8
Maintenance, spares, refurbishment and upgrades
10
Decommission and recycling
7
Health, safety and evidence records
9
01JoinIdentity, attestation quote, signed policy.
02AdmitAdmitted for a stated scope, nothing wider.
03DescribeWhat, where, how and by whom, with calibration.
04TimeOne clock across the grid, with its error bound.
05ObserveEvery value with quality and provenance.
06QualifyTested against the specification, state on record.
07FederateSigned exchange across grids and trust domains.
08OrchestrateSoftware and configuration by signed plan.
03On the grid
The open networks on the grid today, over real relief and the geodesic cells we count them into, filtered to the solid earth domain this area serves. A site built here enrols into the same grid.
04In the field
5 deployment scenarios from the sector research that rely on decommission.
Government and public safety05Open and enterprise
The open counterpart lives on the main site for anyone to read and run. The enterprise service is designed, deployed and operated with you, under contract.
Open, on the main site
Enterprise, on this site
06The rest of the line
Survey, design, deployment and operation for decommission. The form names who receives your details.
Talk to uscontact@observatory.globalDecommission, inside Field services: decommission planning, electronic waste, battery end of life, transboundary waste movement and more. Every item is traced to its specification, from ISO 55001:2024 to ISO 14001:2015, and runs on the open Observatory Protocol.
The open counterpart lives on the main site for anyone to read and run. The enterprise service is designed, deployed and operated with you, under contract.
Global Privacy Control detected. We have honored it as your request to opt out of the sale and sharing of your personal information and of targeted advertising.Signal Global Privacy Control détecté. Nous l'avons respecté comme une demande d'opposition à la vente et à la communication de vos renseignements personnels ainsi qu'à la publicité ciblée.
Cookie policyPolitique relative aux témoins Privacy policyPolitique de confidentialité Do Not Sell or Share My Personal InformationNe pas vendre ni communiquer mes renseignements personnels
Your browser sent a Global Privacy Control signal. We treat it as a refusal for the purposes marked below, and those switches stay off.Votre navigateur a envoyé un signal Global Privacy Control. Nous le traitons comme un refus pour les finalités indiquées ci-dessous, et ces interrupteurs restent désactivés.
Needed for the site to work, to keep you signed in, to protect it from attacks and to remember your privacy choices and the settings you pick. Always on.Nécessaires au fonctionnement du site, pour vous garder connecté, le protéger contre les attaques et retenir vos choix de confidentialité et les réglages que vous choisissez. Toujours actifs.
Remember optional settings beyond the ones you pick yourself. Off until you allow it.Retenir des réglages facultatifs autres que ceux que vous choisissez vous-même. Désactivés tant que vous ne les autorisez pas.
Count visits and see how pages are used, so we can improve the site. Off until you allow it.Compter les visites et voir comment les pages sont utilisées, afin d'améliorer le site. Désactivés tant que vous ne les autorisez pas.
Show videos, maps and live data layers from other providers. They receive your IP address and may set their own cookies. Off until you allow it, or load a single item once.Afficher des vidéos, des cartes et des couches de données en direct d'autres fournisseurs. Ceux-ci reçoivent votre adresse IP et peuvent déposer leurs propres témoins. Désactivés tant que vous ne les autorisez pas, ou chargez un seul élément une fois.
Measure campaigns and personalise advertising. We use none today. Off until you allow it, and refused when your browser sends Global Privacy Control.Mesurer les campagnes et personnaliser la publicité. Nous n'en utilisons aucun actuellement. Désactivés tant que vous ne les autorisez pas, et refusés lorsque votre navigateur transmet le signal Global Privacy Control.
Nexus Observatory Inc. keeps a record of each choice as proof: a random consent ID, the time, your region and the rules applied, the choices, the notice shown, the page, a shortened IP address, a one-way code of your browser type and, if you are signed in, your account. Records are kept while your choice applies and for 3 years after, then deleted.Nexus Observatory Inc. conserve un registre de chaque choix à titre de preuve : un identifiant de consentement aléatoire, l'heure, votre région et les règles appliquées, les choix, l'avis affiché, la page, une adresse IP abrégée, un code à sens unique du type de navigateur et, si vous êtes connecté, votre compte. Les registres sont conservés tant que votre choix s'applique et pendant 3 ans par la suite, puis supprimés.