Nexus Observatory Sign inCreate account

Pier stakes · three legs, 3.4 m face

GNSS base · pier positions

Survey drone · terrain model

25.2 m · lattice to 18 m, straight above

Radios and backhaul

Lines swept, links proven

Three sectors in service

Radios swapped · steel stays

Footprint restored · piers removed below grade

Crew truck

Survey · year 0

Year 20 · removal

Year 0 · in service

Needs 1.8 m

Ground · 6.5 m below the feet

Stock 3 · covers 95 % of lead times

Fleet · red units are down

Failures in one lead time · Poisson

Fibre to the hub

Cabinet · sweep and power

Lattice steel · recycle

Concrete piers · recycle

LFP battery packs · recycle

Equipment cabinet · reuse

Hybrid trunk cable · recycle

Radios · reuse

Depot · 1,523 m, valley floor

Depot

Crew truck

Site A · 2,727 m

Site B · 2,636 m

Site C · 2,520 m

Intro.

Field services · Explainer

One site, from survey stake to final truckload.

A remote site is built, proven, kept running and finally taken away by people in trucks and on ladders. Seven steps of that work, each worked live: the lifecycle, the crew’s route, the radio survey, the climb, the acceptance test, the spares that keep a fleet running and the ledger that closes the site. Every number below is computed live from your inputs.

01 · Site lifecycle

Seven stages, one site, decades apart.

Survey fixes where the foundations go and what the ground will carry. Design turns that into drawings and a structural check. Install and commission happen in weeks; operation lasts as long as the structure and the power hold, broken by planned refurbishments; decommissioning returns the ground. Planned attendances are the three build visits, the preventive visits over the service life, each refurbishment and the final removal.

Stage

Survey: a GNSS base fixes the pier positions to the centimetre, a drone flies the parcel for a terrain model and test pits tell the designer what the ground will bear.

Preventive visits over the life
40
Refurbishments
2
Planned site attendances
46

02 · Crew route

The truck takes the cheapest way up, not the shortest.

On the Bow Valley elevation model the route is a least-cost path from the valley-floor depot: each step costs its surface length weighted by 1 + 10g², where g is the grade, and steps steeper than the limit are not allowed. Lower the limit and the route lengthens, switches back or stops short of the ridge.

Site

Average speed

Route length
25.7 km
Total climb
1,364 m
Steepest step on the route
13.6 %
Straight-line distance
12.5 km
Drive time, one way
0 h 51 min

03 · RF survey along the route

Free space sets the floor. The ridge decides the rest.

The survey walks the access route and predicts the signal from the mast at every step. Free-space loss is 20 log10(d km) + 20 log10(f MHz) + 32.44 dB. Each path is checked against the terrain with the Earth bulge for k = 4/3; where a ridge cuts into Fresnel zone 1, the worst obstacle is treated as a knife edge, ν = h√(2(d₁+d₂)/(λd₁d₂)), with loss 6.9 + 20 log10(√((ν−0.1)²+1) + ν − 0.1) dB. Points below −100 dBm turn red.

Frequency

Surveyor distance
–
Free-space loss
–
Worst obstruction loss
–
Predicted level
–
Route above −100 dBm
100 %

04 · Tower climb

A fall arrest only works if there is room to stop.

Clearance needed below the feet is the free fall, plus the arrest distance, plus about 0.3 m of harness stretch and D-ring shift, plus a 0.6 m margin. The runner on a rigid ladder rail lets the climber drop about 0.3 m and stops within about 0.6 m. A 1.8 m energy-absorbing lanyard falls its own length plus the drop from anchor to D-ring, about 1.5 m above the feet, and its absorber may extend up to about 1.2 m. Low on the ladder, or just above a platform, a lanyard tied at the feet cannot stop a fall in time.

Fall-arrest system

  • Permit, rescue plan, radios locked out ground
  • Runner on the rail before climbing 0.3 m
  • Rest platform 9 m
  • Rest platform 17 m
  • Through the hatch, tied off before leaving the rail 24 m
Free fall
0.3 m
Clearance needed below the feet
1.8 m
Clearance available
6.5 m
Verdict
Arrest stops in time

05 · Acceptance test

Commissioning ends when every line of the checklist passes.

The antenna line is swept for reflections: with reflection coefficient Γ = (VSWR − 1)/(VSWR + 1), return loss is −20 log10Γ and mismatch loss is −10 log10(1 − Γ²); the line passes at 14 dB of return loss or better. The fibre passes when the optic’s power budget exceeds 0.35 dB/km at 1310 nm, two connectors at 0.5 dB, a splice every 2 km at 0.1 dB and a 3 dB repair margin.

Optic power budget

Run the test

  • Visual and torque inspection –
  • Grounding and bonding –
  • Antenna line sweep –
  • Fibre link budget –
  • Timing reference lock –
  • Alarms reach operations –
  • As-built record filed –
Return loss · mismatch loss
19.1 dB · 0.05 dB
Fibre loss · margin left
5.8 dB · 6.2 dB
Result
Not run

06 · Repair time and spares

Availability is bought with repair time and stock on the shelf.

A fleet of N units with mean time between failures MTBF fails N · 8760 / MTBF times a year. One unit is available MTBF / (MTBF + MTTR) of the time. Failures in a resupply lead time follow a Poisson distribution with mean N · lead time / MTBF, so the spares to hold are the smallest stock whose cumulative probability reaches the service level. Each bar in the scene is one stock level.

Service level

Failures a year
10.5
Unit availability
99.988 %
Downtime per unit a year
63 min
Mean failures in a lead time
1.30
Spares to hold
3 · P(enough) 95.7 %

07 · Decommission ledger

Every tonne leaves the site with a destination.

The ledger weighs what comes down by class figures: about 120 kg of lattice steel per metre of a light three-leg tower, concrete piers at 2.4 t/m³ for three Ø1.0 m × 3 m piers, lithium iron phosphate packs at about 7 kg per kWh, 150 kg per equipment cabinet, and hybrid trunk cable at 0.6 kg per metre for six runs up the tower. Choose each line’s destination; the diversion rate is reused plus recycled mass over total mass. Each block in the scene is half a tonne.

  • Lattice steel · 3.0 t
  • Concrete piers · 17.0 t
  • LFP battery packs · 420 kg
  • Equipment cabinet · 150 kg
  • Hybrid trunk cable · 90 kg
  • Radios, antennas, dishes · 240 kg
Total removed
20.9 t
Reused · recycled
20.9 t
To disposal
0.0 t
Diversion rate
100.0 %
Loading the scene…
Field services · Explainer

One site, from survey stake to final truckload.

A remote site is built, proven, kept running and finally taken away by people in trucks and on ladders. Seven steps of that work, each worked live: the lifecycle, the crew’s route, the radio survey, the climb, the acceptance test, the spares that keep a fleet running and the ledger that closes the site. Every number below is computed live from your inputs.

01 · Site lifecycle

Seven stages, one site, decades apart.

Survey fixes where the foundations go and what the ground will carry. Design turns that into drawings and a structural check. Install and commission happen in weeks; operation lasts as long as the structure and the power hold, broken by planned refurbishments; decommissioning returns the ground. Planned attendances are the three build visits, the preventive visits over the service life, each refurbishment and the final removal.

Stage

Preventive visits over the life
–
Refurbishments
–
Planned site attendances
–
02 · Crew route

The truck takes the cheapest way up, not the shortest.

On the Bow Valley elevation model the route is a least-cost path from the valley-floor depot: each step costs its surface length weighted by 1 + 10g², where g is the grade, and steps steeper than the limit are not allowed. Lower the limit and the route lengthens, switches back or stops short of the ridge.

Site
Average speed
Route length
–
Total climb
–
Steepest step on the route
–
Straight-line distance
–
Drive time, one way
–
03 · RF survey along the route

Free space sets the floor. The ridge decides the rest.

The survey walks the access route and predicts the signal from the mast at every step. Free-space loss is 20 log10(d km) + 20 log10(f MHz) + 32.44 dB. Each path is checked against the terrain with the Earth bulge for k = 4/3; where a ridge cuts into Fresnel zone 1, the worst obstacle is treated as a knife edge, ν = h√(2(d₁+d₂)/(λd₁d₂)), with loss 6.9 + 20 log10(√((ν−0.1)²+1) + ν − 0.1) dB. Points below −100 dBm turn red.

Frequency
Surveyor distance
–
Free-space loss
–
Worst obstruction loss
–
Predicted level
–
Route above −100 dBm
–
04 · Tower climb

A fall arrest only works if there is room to stop.

Clearance needed below the feet is the free fall, plus the arrest distance, plus about 0.3 m of harness stretch and D-ring shift, plus a 0.6 m margin. The runner on a rigid ladder rail lets the climber drop about 0.3 m and stops within about 0.6 m. A 1.8 m energy-absorbing lanyard falls its own length plus the drop from anchor to D-ring, about 1.5 m above the feet, and its absorber may extend up to about 1.2 m. Low on the ladder, or just above a platform, a lanyard tied at the feet cannot stop a fall in time.

Fall-arrest system
  • Permit, rescue plan, radios locked outground
  • Runner on the rail before climbing0.3 m
  • Rest platform9 m
  • Rest platform17 m
  • Through the hatch, tied off before leaving the rail24 m
Free fall
–
Clearance needed below the feet
–
Clearance available
–
Verdict
–
05 · Acceptance test

Commissioning ends when every line of the checklist passes.

The antenna line is swept for reflections: with reflection coefficient Γ = (VSWR − 1)/(VSWR + 1), return loss is −20 log10Γ and mismatch loss is −10 log10(1 − Γ²); the line passes at 14 dB of return loss or better. The fibre passes when the optic’s power budget exceeds 0.35 dB/km at 1310 nm, two connectors at 0.5 dB, a splice every 2 km at 0.1 dB and a 3 dB repair margin.

Optic power budget
Run the test
  • Visual and torque inspection–
  • Grounding and bonding–
  • Antenna line sweep–
  • Fibre link budget–
  • Timing reference lock–
  • Alarms reach operations–
  • As-built record filed–
Return loss · mismatch loss
–
Fibre loss · margin left
–
Result
–
06 · Repair time and spares

Availability is bought with repair time and stock on the shelf.

A fleet of N units with mean time between failures MTBF fails N · 8760 / MTBF times a year. One unit is available MTBF / (MTBF + MTTR) of the time. Failures in a resupply lead time follow a Poisson distribution with mean N · lead time / MTBF, so the spares to hold are the smallest stock whose cumulative probability reaches the service level. Each bar in the scene is one stock level.

Service level
Failures a year
–
Unit availability
–
Downtime per unit a year
–
Mean failures in a lead time
–
Spares to hold
–
07 · Decommission ledger

Every tonne leaves the site with a destination.

The ledger weighs what comes down by class figures: about 120 kg of lattice steel per metre of a light three-leg tower, concrete piers at 2.4 t/m³ for three Ø1.0 m × 3 m piers, lithium iron phosphate packs at about 7 kg per kWh, 150 kg per equipment cabinet, and hybrid trunk cable at 0.6 kg per metre for six runs up the tower. Choose each line’s destination; the diversion rate is reused plus recycled mass over total mass. Each block in the scene is half a tonne.

    Total removed
    –
    Reused · recycled
    –
    To disposal
    –
    Diversion rate
    –