Skip to content
Nexus Observatory

/

Communities

/

Specialized fields

/

Community early warning

Warnings that reach the last household.

National warnings often miss small valleys and villages, and arrive in ways not everyone receives. A community early warning system of rain and river gauges, local thresholds, sirens and messages, linked to the national service, gives people the minutes they need to move.

Plan a deploymentHow it worksStation Builder
Industry
Communities
Measurements
4
Sources cited
5
  1. Communities · Community early warning

    Minutes that matter

    Flash floods in small valleys can rise in less than an hour, and national warnings often miss them or arrive in ways not everyone receives. The global disaster risk framework asks for early warning that is people-centred and reaches everyone. A community system gives people the minutes they need.

  2. What is measured

    Rain upstream, rivers rising

    Rain gauges in the upper catchment and river gauges upstream of the community report every few minutes, faster when levels rise. Each gauge sits above past flood marks on a secure pole, with its own solar panel and battery, so it keeps reporting during the event.

    Instruments
    Rain gauges · River level gauges
  3. The base node

    Local thresholds, local alerts

    The node at the community centre applies thresholds agreed by the community and the national service. When rain or river crosses them, it sounds sirens, sends messages and radio announcements, and records every alert and every acknowledgement from focal points.

  4. Radio and links

    Low-power radio, cellular and sirens

    Gauges reach the community gateway over a long-range, low-power link. The node exchanges alerts with the national service in the common alerting protocol over cellular, and community radio and sirens reach the households without phones, so nobody depends on a single channel.

    Links
    LoRaWAN · Public cellular · VHF/UHF
  5. How it works

    From a rain gauge to safe ground

    A storm stalls over the upper valley. Rain gauges report intense rainfall, then the river gauge climbs past its first threshold. The node sounds the sirens and sends messages; focal points check on elderly neighbours, families move to the school on the hill, and the national service sees the alert.

  6. From order to operation · Order

    Scope with the community and the service

    The scope brings together the community, the local authority and the national warning service: the hazards, past floods, who must be warned, how and how fast. Nexus Observatory Inc. returns the gauge plan, thresholds approach, dissemination design, training and a price for building and for each year.

    Plan a deployment
  7. From order to operation · Survey

    Map the risk together

    Crews walk the catchment with community members: flood marks and stories of past events, gauge sites safe from the floods they measure, gateway and siren positions, and the households hardest to reach. The risk map is drawn with the community.

  8. From order to operation · Permits

    Land, radio and roles

    Land owners approve gauge sites, radio and siren use are licensed or registered, and the community agrees who receives alerts, who sounds sirens and who checks on vulnerable neighbours. The national service agrees how local alerts relate to its own warnings.

  9. From order to operation · Build

    Build and test the chain

    Gauges, radios, the gateway, node, sirens and message service are configured and tested together as one chain, from a simulated rise to a siren and a message. Nodes are enrolled with their identities and community volunteers join the tests. Nothing ships until the whole kit has passed its tests together.

    Open the Station Builder
  10. From order to operation · Install

    Install with volunteers

    Crews and volunteers install gauges on secure poles above flood marks, the gateway and node at the community centre, and sirens where every household can hear them. Every part is photographed, and volunteers learn how to check each one. Crews follow the site safety plan throughout the work.

  11. From order to operation · Commission

    Commission with a drill

    Each node proves its identity, gauges are checked against staff gauges and manual readings, and the community runs a full drill: alert, siren, messages, acknowledgements and movement to safe places. Response times are recorded and thresholds reviewed. Acceptance is recorded with the owner before handover.

  12. From order to operation · Operate

    Warn and respond

    The community and the national service see rain and river levels live. Alerts go out by siren, message and radio when thresholds are crossed, focal points confirm that households have heard, and every event is recorded for the next review.

  13. From order to operation · Maintain

    Drill every season

    Gauges are checked by volunteers before each rainy season, drills are repeated, thresholds are reviewed after every event, new volunteers are trained, and software updates arrive remotely in rings. Every change is kept with the system record. Maintenance history stays with each site for its whole life.

    Book field services
  14. Data products

    For every household

    The community and local authority receive rain and river levels; every household receives alerts by siren, message and radio; focal points and the national service receive alert and acknowledgement records; the community and funders receive drill and event reviews, each tied to the place and time.

    See the data products
  15. Evidence

    People-centred, on record

    The system follows the four parts of the international early warning checklist and the people-centred approach of the global disaster risk framework. Rivers are gauged to hydrological practice, rain to the instrument guide, and alerts use the common alerting protocol. Every alert, drill and response is recorded.

    Drawn against
    WMO-No. 1150 · Sendai Framework for Disaster Risk Reduction 2015-2030 · WMO-No. 168 · WMO-No. 8 · ITU-T X.1303
  16. What you get

    Sensing as a Service

    Observation networks designed, installed, operated and maintained for a monthly fee: weather, hydromet, air, seismic and environmental stations, with data delivered under a licence. Delivered as managed service and data licence, for agencies, utilities, municipalities, insurers, agribusiness. Scale: Global, multi-site, per-site pricing.

    Talk to sales
  17. Next step

    Plan community early warning with us

    Tell us the site, the measurements and the rules it answers to. We reply with a survey proposal, a design and a scope for community early warning. An engineer replies with a survey proposal and a scope, and the plan grows from one site to the network you need, at your pace.

    Plan a deploymentOpen the Station BuilderOpen the Studio

01The place and its hazards

Where it runs, and what can go wrong.

Operating contextThe global disaster risk framework calls for people-centred early warning, and the international checklist sets out its four parts: risk knowledge, monitoring, dissemination and response capability. Rivers are gauged to hydrological practice, rainfall to the instrument guide, and alerts are exchanged in the common alerting protocol so every channel can carry them.

Hazards

  • Flash floods in small valleys with no national gauge
  • Warnings that never reach households without phones
  • Thresholds set far away without local knowledge
  • Gauges washed away in the floods they warn of
  • Volunteers who leave and take the skills with them

02What must be measured

What, where, how often, and under which rules.

Each measurement names where it is taken, how often, and the public standard or regulation behind it. Numbers in the sources column open the cited source below.

MeasurementWhereCadenceSources
RainfallGauges in the upper catchmentEvery few minutes1
River levelGauges upstream of the communityEvery few minutes, faster when rising2
Alert dissemination and acknowledgementSirens, messages and focal pointsEvery alert34
Drills and response timesCommunity drills and real eventsEach drill and event35

03The observation stack

From one base unit to a network.

The same blocks at every scale: instruments and a base node, a site with its radio, a fleet run as one, and a network federated on the open protocol.

  1. 01

    Base unit

    A gauge: a rain or river sensor on a low-power radio with its own battery and solar panel.

    Build a station →
  2. 02

    Site

    A community: gauges in the catchment, a gateway, a node at the community centre, sirens and a message service.

    Plan a site →
  3. 03

    Fleet

    Many communities in a basin linked, so an upstream rise warns those downstream.

    Managed offers →
  4. 04

    Network

    Community systems exchange alerts with the national warning service in the common alerting protocol.

    The open protocol →
  • 01Water level gauge
  • 02Compact weather station
  • 03LPWAN endpoint
  • 04LoRaWAN gateway
  • 05Micro node (Nano)
  • 06Cellular modem/router
  • 07Solar array
  • 08Pole

Radio and links

LoRaWAN

Gauges in the catchment reach the community gateway over a long-range, low-power link.

Radio and links

Public cellular

The node sends alerts and data to the national service and phones over cellular.

Radio and links

VHF and UHF radio

Community radio and sirens reach households without phones.

Edge computeThe node applies thresholds agreed with the community and the national service, raises alerts when rain or river crosses them, triggers sirens and messages, and records every alert and acknowledgement.

PowerGauges run on small solar panels and batteries; the node and sirens have batteries that outlast a storm’s power cut.

04How it works

From the instrument to the product.

One observation’s path, tier by tier, with the interface on every link and a bill of materials below; then how the one node grows to a site, a fleet and federated networks.

Community early warning: data path

– of 08

01 Instruments Measurement with sensor identity andcalibration 02 Field radio 03 Gateway 04 Node – Wrap in an observation envelope with timequality– Measure quality and uncertainty, attachquality flags– Buffer locally (store-and-forward when thelink drops) 05 Backhaul Commit with transactional outbox andpublish, delivered at least once 06 Site Consumer inbox deduplicates and applieseach record once into governed data 07 Data store Governed product through API, map orexport, correction-aware 08 Products CAP 1.2OGC SensorThings APIWMO WIS 2.0 09 Power and structure Supplies 12 V DC to the field equipment 01 Water level gauge SDI-12 · RS-485 · Ethernet 02 Compact weather station SDI-12 · RS-485 · Ethernet 03 LPWAN endpoint Analogue I/O · SDI-12 · RS-485 04 LoRaWAN gateway Ethernet · RF · GNSS antenna 05 Micro node (Nano) Ethernet · USB · Analogue I/O ·RS-485 · CAN 06 Cellular modem/router Ethernet · USB · RS-232 Site MQTT 5 with Sparkplug B Governed data store Versioned, correction-aware Rain and river levels Alerts by siren, message and radio Alert and acknowledgement records Drill and event reviews 07 Solar array RS-485 08 Pole SDI-12 SDI-12 LoRaWAN Ethernet Ethernet LTE/NR
From the instrument to the published product: each band is a tier, each connector names its interface, and the numbers match the bill of materials. Hover or focus a block to trace its path; scroll or step to follow one observation.
Bill of materials
ItemEquipmentData portsProtocolsPower in
01Water level gaugeRadar, pressure or float gauge for river, lake, reservoir or tide level.SDI-12RS-485EthernetSDI-12, Modbus, MQTT 5, OGC SensorThings API12 V DC
02Compact weather stationAll-in-one or compact station for temperature, humidity, pressure, wind and rain at a site.SDI-12RS-485EthernetSDI-12, Modbus, MQTT 5, OGC SensorThings API12 V DC
03LPWAN endpointBattery-powered endpoint on LoRaWAN, NB-IoT or LTE-M that carries one or more sensors.Analogue I/OSDI-12RS-485LoRaWAN, OMA LwM2M, CoAPInternal battery, Energy harvesting
04LoRaWAN gatewayMulti-channel LoRaWAN gateway that forwards uplinks to a network server and schedules downlinks within duty limits.EthernetRFGNSS antennaLoRaWAN, MQTT 5PoE, 12 V DC
05Micro node (Nano)Single-board or module-class node for sensor sites, gateways and low-power deployments.EthernetUSBAnalogue I/ORS-485CANMQTT 5, OMA LwM2M, CoAPPoE, 12 V DC, USB PD
06Cellular modem/routerLTE or NR modem or router that uses a public carrier or private network as backhaul.EthernetUSBRS-2323GPP E-UTRA air interface, 3GPP NR air interface, OMA LwM2M12 V DC, PoE
07Solar arrayPV modules with charge controller sized to the site’s load and climate.RS-485Modbus—
08PoleUtility, street or dedicated pole with clamp positions.———

How it scales

01 Instruments Arbitrary qualified sensors and instruments whosemeasurements are ingested with calibration, units,geometry, time, custody and uncertainty. ×n 02 Node The minimum useful deployable unit: server, ruggedappliance, radio node, sensor gateway, satelliteterminal, AI, scientific, vehicle or virtual node. Node Node agent 03 Site The minimum independently operable localgovernance and failure domain: one or more nodesplus local network, identity, policy, evidence,storage, products and operator surfaces.

SITE

Node Node Node ×n 04 Cluster An optional scale or specialisation domain forscheduling, shared storage, accelerators or datalocality.

CLUSTER

×n 05 Fleet Coordinates plans, acknowledgements,convergence evidence, update campaigns andcorrection propagation across nodes and sites.

FLEET

Fleet controller ×n 06 Federation An exchange of products, capabilities, events orwork across approved, independently administeredtrust domains, using explicit trust, policy,data-locality, version and correction contracts.

TRUST DOMAIN

TRUST DOMAIN

TRUST DOMAIN

×n Verifier Applications Data in the field Telemetry Control Data upstream Control Data upstream Control Exchange Evidence Events Exchange
The smallest deployable unit is one node; the same unit is replicated to meet the demand. Nodes form a site, sites may form a cluster, sites and clusters are coordinated as a fleet, and fleets exchange across independently administered trust domains. Each plane is a separate channel with its own open binding.
Data in the field
MQTT 5 with Sparkplug B; connectors for LoRaWAN, OPC UA and instrument buses.
Telemetry
OpenTelemetry OTLP.
Control
TLS 1.3 with mutual authentication; protobuf messages over gRPC or HTTP/2.
Data upstream
At-least-once publication with repeat-safe keys over the control channel or NATS JetStream; QUIC MAY be used on lossy links.
Evidence
DSSE-signed in-toto statements; SLSA provenance; SCITT transparency receipts.
Events
Event envelopes mapped to CloudEvents 1.0; channels described in AsyncAPI 3.
Exchange
OpenAPI 3.1; the OGC API family; SensorThings; STAC; WIS 2.0.

05From order to operation

Every step, from the first call to a running site.

The same crew and the same record carry the work from scope to maintenance.

  1. 01 Order

    Scope with the community and the service

    The scope brings together the community, the local authority and the national warning service: the hazards, past floods, who must be warned, how and how fast. Nexus Observatory Inc. returns the gauge plan, thresholds approach, dissemination design, training and a price for building and for each year. 35

  2. 02 Survey

    Map the risk together

    Crews walk the catchment with community members: flood marks and stories of past events, gauge sites safe from the floods they measure, gateway and siren positions, and the households hardest to reach. The risk map is drawn with the community. 2

  3. 03 Permits

    Land, radio and roles

    Land owners approve gauge sites, radio and siren use are licensed or registered, and the community agrees who receives alerts, who sounds sirens and who checks on vulnerable neighbours. The national service agrees how local alerts relate to its own warnings.

  4. 04 Build

    Build and test the chain

    Gauges, radios, the gateway, node, sirens and message service are configured and tested together as one chain, from a simulated rise to a siren and a message. Nodes are enrolled with their identities and community volunteers join the tests. Nothing ships until the whole kit has passed its tests together.

  5. 05 Install

    Install with volunteers

    Crews and volunteers install gauges on secure poles above flood marks, the gateway and node at the community centre, and sirens where every household can hear them. Every part is photographed, and volunteers learn how to check each one. Crews follow the site safety plan throughout the work.

  6. 06 Commission

    Commission with a drill

    Each node proves its identity, gauges are checked against staff gauges and manual readings, and the community runs a full drill: alert, siren, messages, acknowledgements and movement to safe places. Response times are recorded and thresholds reviewed. Acceptance is recorded with the owner before handover. 3

  7. 07 Operate

    Warn and respond

    The community and the national service see rain and river levels live. Alerts go out by siren, message and radio when thresholds are crossed, focal points confirm that households have heard, and every event is recorded for the next review. 4

  8. 08 Maintain

    Drill every season

    Gauges are checked by volunteers before each rainy season, drills are repeated, thresholds are reviewed after every event, new volunteers are trained, and software updates arrive remotely in rings. Every change is kept with the system record. Maintenance history stays with each site for its whole life. 5

06Data products and integration

What it delivers, to whom, and into which systems.

Data products

  • Rain and river levelsThe community and the local authority
  • Alerts by siren, message and radioEvery household
  • Alert and acknowledgement recordsFocal points and the national service
  • Drill and event reviewsThe community and funders

Integration

  • National warning serviceLocal alerts and data are exchanged in the common alerting protocol.
  • Message servicesAlerts reach phones through the channels people use.
  • Local authorityEvent records feed the authority’s emergency planning.

Exchanged through CAP 1.2, OGC SensorThings API, WMO WIS 2.0.

07Questions buyers ask

Before you scope it.

Who sets the thresholds?

The community and the national service together, reviewed after every event.

What about households without phones?

Sirens and community radio reach them, and focal points check on them.

Will gauges survive a flood?

They are sited above flood marks on secure poles.

Does it replace national warnings?

No. It adds local detail and reaches the last household.

08Resources

The sources behind this page.

Public standards, regulations and guidance, cited where they apply. Each applies only where its jurisdiction or scope does.

  1. 1WMO-No. 8: Guide to Instruments and Methods of ObservationWorld Meteorological Organization
  2. 2WMO-No. 168: Guide to Hydrological PracticesWorld Meteorological Organization
  3. 3WMO-No. 1150: Multi-hazard Early Warning Systems: A ChecklistWorld Meteorological Organization · 2018
  4. 4ITU-T X.1303: Common alerting protocol (CAP 1.2)International Telecommunication Union
  5. 5Sendai Framework for Disaster Risk Reduction 2015-2030United Nations Office for Disaster Risk Reduction · 2015

09Related

Use cases and solutions.

Use case

Street flood observatory

Ultrasonic depth sensors on poles report street-level water depth as open data and alerts.The full use case →
Use case

Low-cost stream gauge network

Radar or pressure level sensors with low-power radio and solar power, as a cheaper tier beside a national gauge network.The full use case →
Solution

Sensing as a Service

Observation networks designed, installed, operated and maintained for a monthly fee: weather, hydromet, air, seismic and environmental stations, with data delivered under a licence.Solutions for communities →
Solution

Hydrometeorological and flood observing networks

Stream gauges, rain gauges, weather radar and automatic weather stations built to WMO practice, reporting through WIS 2.0 where the agency requires it.Solutions for communities →
Solution

Operator and technician training on delivered systems

Hands-on courses for customer staff on the systems they run; no public credentials are issued by the group.Solutions for communities →

10Communities: specialized fields

Other fields of this industry.

Specialized field

Community cellular and broadband

Cellular and Wi-Fi networks a community owns and runs, on shared or community spectrum, with solar power and satellite or microwave backhaul where carriers do not build.The full field →
Specialized field

Community microgrids

Solar, battery and backup generation for remote communities, monitored and run locally, with energy access measured to the international framework.The full field →
Specialized field

Small community water systems

Water quality, chlorine, tank levels and pumps in small community supplies, watched continuously so operators keep water safe and fix faults before taps run dry.The full field →

Bring us the site.

Plan a deployment, configure a station, model it in the Studio or talk to sales. The form names who receives your details.

Plan a deploymentStation BuilderOpen the StudioTalk to salesRequest a quote